6701 Back
Austin, TX 78739
6701 Back: 4 projects on record
City of Austin lists 4 filings across 4 projects at 6701 Back, Austin, TX 78739 since September 9, 2024. The most recent, filed January 14, 2025, covers: “Rinnai re199in tankless with h in attic tie into main line ran in front of with h”.
Compiled from City of Austin records · updated Jan 14, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jan 14, 2025
- since Sep 9, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsRinnai re199in tankless with h in attic tie into main line ran in front of with h
Rinnai re199in tankless with h in attic tie into main line ran in front of with h
City of Austin permitPlumbing PermitFinal- Record
- 2025-002815 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Add gfci outlet for tankless wh in attic
Add gfci outlet for tankless wh in attic
City of Austin permitElectrical PermitFinal- Record
- 2025-002816 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-112798 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction of 400 sq ft in-ground pool and 49 sq ft spa
New construction of 400 sq ft in-ground pool and 49 sq ft spa
City of Austin permitBuilding PermitFinal- Record
- 2021-169317 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6701 Back
What is being built at 6701 Back?
The latest filing (City of Austin permit 2025-002815 PP, January 14, 2025) covers rinnai re199in tankless with h in attic tie into main line ran in front of with h.
How many permits and filings does 6701 Back have?
4 filings across 4 projects, from September 9, 2024 to January 14, 2025.
Is there other construction near 6701 Back?
Yes. Nearby filings include 6704 Back (level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. + #10 thhn c.u. ground <5ft 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw, Jul 22, 2026); 6713 Back (we will be tunneling on the left side of the home to expose the master bath to fix a 2-in branch line cross-fitting that ties into the tub, Sep 23, 2024); 6613 Back (replacement of an existing water heater replacement of two water heaters with two new 40-gallon natural gas a.o. smith heaters, Jun 12, 2025).
How do I get alerts for new permits at 6701 Back?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78739- 6704 BackJul 22, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. + #10 thhn c.u. ground <5ft 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 53 m away
- 6713 BackSep 23, 2024We will be tunneling on the left side of the home to expose the master bath to fix a 2-in branch line cross-fitting that ties into the tub · 59 m away
- 6613 BackJun 12, 2025Replacement of an existing water heater replacement of two water heaters with two new 40-gallon natural gas a.o. smith heaters · 62 m away
- 6808 Walebridge LnJun 12, 2025Install new 11.06kw rooftop solar system to existing residential only using backfed breaker. upgrading main service panel to 200amps. utility company - pec · 99 m away
- 6513 Way LnFeb 14, 2024Express: replace windows · 114 m away
- 11018 SouthJun 16, 2025Replacement of an existing water heater conversion of tank type to tankless water heater · 153 m away
- 6509 Way LnJul 16, 2026Replacement of an existing water heater replacing like/like g water heater · 158 m away
- 6500 Way LnJun 8, 2026Replacement of an existing water heater water heater replacement · 160 m away
- 6505 Way LnSep 10, 2025Replacement of complete existing central heat and air system with or without duct work · 171 m away
- 11208 Maelin DrApr 2, 2025Replacement of an existing water heater replaced tankless water heater · 180 m away
- 11216 Maelin DrAug 12, 2024Approximately 35 of gas piping from gas meter to new home generator. some trenching and underground gas piping required · 197 m away
- 6620 Orchard Hill DrAug 31, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two stage horizontal gas system · 216 m away