508 Gate Tree Ln
Austin, TX 78745
508 Gate Tree Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 508 Gate Tree Ln, Austin, TX 78745. The most recent, filed May 6, 2024, covers: “Repair only permit pulled asap; mast replacement storm damage. ***emergency inspection done on 4/29/24-hyatt”.
Compiled from City of Austin records · updated May 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2024
- since May 6, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRepair only permit pulled asap; mast replacement storm damage. ***emergency inspection done on 4/29/24-hyatt
Repair only permit pulled asap; mast replacement storm damage. ***emergency inspection done on 4/29/24-hyatt
City of Austin permitElectrical PermitFinal- Record
- 2024-055800 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 508 Gate Tree Ln
What is being built at 508 Gate Tree Ln?
The latest filing (City of Austin permit 2024-055800 EP, May 6, 2024) covers repair only permit pulled asap; mast replacement storm damage. ***emergency inspection done on 4/29/24-hyatt.
How many permits and filings does 508 Gate Tree Ln have?
1 filing across 1 project, from May 6, 2024 to May 6, 2024.
Is there other construction near 508 Gate Tree Ln?
Yes. Nearby filings include 507 Arbor Ln (replacement of complete existing central heat and air system with or without duct work, May 1, 2025); 503 Arbor Ln (aux permit needed to clear pv final inspection in correlation with passed upgrade permit 2023-091324 ep, Jan 25, 2024); 504 Arbor Ln (excavate 15 tunnel to repair main drain line under house, Oct 22, 2025).
How do I get alerts for new permits at 508 Gate Tree Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 507 Arbor LnMay 1, 2025Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 503 Arbor LnJan 25, 2024Aux permit needed to clear pv final inspection in correlation with passed upgrade permit 2023-091324 ep · 65 m away
- 504 Arbor LnOct 22, 2025Excavate 15 tunnel to repair main drain line under house · 88 m away
- 508 Arbor LnNov 10, 2026Upgrade panel from a 100 amp federal pacific panel to a 200 amp eaton panel · 90 m away
- 409 Arbor LnFeb 23, 2024Replacement of an existing gas water heater · 93 m away
- 405 Gate Tree LnFeb 16, 2024Whole house repipe for drainage · 93 m away
- 402 Gate Tree LnNov 11, 2025Irrigation for lawn · 101 m away
- 500 Arbor LnMar 11, 2026Swimming pool (20 x 12) and concrete pool decking · 108 m away
- 407 Arbor LnJun 4, 2025Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 605 Arbor CirJun 6, 2025Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 405 Arbor LnAug 22, 2025Tunnel under foundation and replace drain line to laundry and kitchen with pvc · 128 m away
- 401 Gate Tree LnApr 9, 2026Replacement of complete existing central heat and air system with or without duct work · 127 m away