groundranger
Recent · latest filing Jun 2026Residential

5 Ehrlich Rd

Austin, TX 78746

Rooftop solar and battery system permitted at Austin residence

City of Austin permits indicate a 9.57 kW rooftop solar PV system and 36.16 kWh energy storage system at 5 Ehrlich Rd. The solar permit was filed June 15, 2026; a related electrical permit for a microgrid interconnection device was filed June 8, 2026. Both permits are listed as final.

Summarized from City of Austin records · updated Jun 15, 2026

Projects
2
2 filings
Latest filing
Jun 15, 2026
since Jun 8, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Installation of 9.57 kw solar pv system to roof of residence with 36.16 kwh ess

    Installation of 9.57 kw solar pv system to roof of residence with 36.16 kwh ess

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnet installation of 200 amp microgri interconnection device on service with existing 200 amp meter can to remain

    Request to disconnet installation of 200 amp microgri interconnection device on service with existing 200 amp meter can to remain

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5 Ehrlich Rd

What is being installed at 5 Ehrlich Rd in Austin?

City of Austin permit 2026-070255 EP describes a 9.57 kW rooftop solar PV system with a 36.16 kWh energy storage system at the residence. It was filed June 15, 2026.

Is there a battery system planned for 5 Ehrlich Rd?

Yes. The June 15, 2026 electrical permit lists a 36.16 kWh energy storage system alongside the rooftop solar installation.

What electrical work is listed for 5 Ehrlich Rd?

Permit 2026-070928 EP, filed June 8, 2026, describes a request to disconnect and install a 200-amp microgrid interconnection device. It notes that the existing 200-amp meter can is to remain.

When were the permits filed for the work at 5 Ehrlich Rd?

The microgrid interconnection permit was filed June 8, 2026, and the solar and energy storage permit was filed June 15, 2026. Both are listed as final.

What's being built near Bee Caves Readiness Center Major Maintenance?

At 5 Ehrlich Rd, about 470 meters from the Bee Caves Readiness Center Major Maintenance site, City of Austin permits indicate a rooftop solar PV system with battery storage. The solar permit was filed June 15, 2026.

Is a new home being built at 5 Ehrlich Rd?

The records provided describe electrical work at a residence: rooftop solar, energy storage, and a microgrid interconnection device. They do not list a new-home construction permit.

Also being built nearby

All of 78746

More solar installs in 78746.

Get alerts for 5 Ehrlich Rd