11109 Players Path
Austin, TX 78747
5.7-kW rooftop solar system permitted at Austin home
A 5.7-kW rooftop solar system is being installed at an existing residence at 11109 Players Path. The City of Austin issued the solar electrical permit on Jan. 7, 2026, and a related electrical permit for connecting the system and upgrading the service was issued Jan. 12.
Summarized from City of Austin records · updated Jan 12, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 12, 2026
- since Jan 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsRequest to disconnect - sanchez 39-23583 - disconnect/reconnect power to tie in pv component and upgrading msp to 225 amps. 200 main breaker only
Request to disconnect - sanchez 39-23583 - disconnect/reconnect power to tie in pv component and upgrading msp to 225 amps. 200 main breaker only
City of Austin permitElectrical PermitFinal- Record
- 2026-003093 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sanchez 39-23583 - install new 5.7kw rooftop solar system to existing residential only using backfed breaker
Sanchez 39-23583 - install new 5.7kw rooftop solar system to existing residential only using backfed breaker
City of Austin permitElectrical PermitFinal- Record
- 2026-001402 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11109 Players Path
What is being installed at 11109 Players Path?
A City of Austin permit describes a new 5.7-kW rooftop solar system at an existing residence. Permit 2026-001402 EP was issued Jan. 7, 2026.
When was the solar permit filed for 11109 Players Path?
The City of Austin issued permit 2026-001402 EP on Jan. 7, 2026, for the rooftop solar installation.
Is a new house being built at 11109 Players Path?
The permits describe work at an existing residence, not construction of a new house. The listed work is a rooftop solar installation and related electrical service work.
What electrical work is planned at 11109 Players Path?
Permit 2026-003093 EP covers disconnecting and reconnecting power to tie in the solar component and upgrading the main service panel to 225 amps, with a 200-amp main breaker. It was issued Jan. 12, 2026.
How large is the rooftop solar system at 11109 Players Path?
The City of Austin permit describes a 5.7-kW system. It is for an existing residence.
Also being built nearby
All of 78747- 11105 Mickelson DrJul 2, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 11021 Players PathJul 22, 2025Utility disconnect/reconnect. tesla backup switch. underground service. ae. meter can does not need replacing- no espa attached · 100 m away
- 11017 Players PathOct 14, 2026Express: foundation repair-24 steel piers · 118 m away
- 11213 Mickelson DrMar 24, 2025Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 11217 Mickelson DrJul 23, 2026Replacing 35 feet of sewer main under the home through an engineer approved tunnel · 159 m away
- 11200 Mickelson DrNov 4, 2025Express: foundation repair · 160 m away
- 11000 Players PathAug 5, 2026Shearhart - 39-95875 install new 5.76kw rooftop solar system to existing residential only using backfed breaker only · 193 m away
- 11404 River Plantation DrApr 18, 2025Perform 2 separate spot repairs on sewer line. 1st spot repair will be near retaining wall for flower bed (includes new 2-way clean out) 2nd spot repair will be made near city cleanout. both spots will include setup 811 utility locate services& mark out areas of excavation excavation (up to 5 in length & 4 in depth) at both areas of failure removal of damaged sections of pipe install new sch 40 pvc pipe sand bedding areas of repair (to minimize movement with ground shifting) leak test backfill · 219 m away
- 5504 Mickelson CvSep 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 255 m away
- 10908 Players PathMar 24, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw · 264 m away
- 11416 River Plantation DrOct 9, 2026Install new gas line for generator · 276 m away
- 11118 Golf CvJun 16, 2015Onion creek addition joint access improvements · 277 m away
More solar installs in 78747.