1700 E Slaughter Ln
Austin, TX 78747
Rooftop solar system permitted at 1700 E Slaughter Ln
A 144.40 kW rooftop solar system for an existing commercial property was permitted on June 6, 2024. A later permit for reconnecting and disconnecting a solar system was withdrawn on June 12, 2024.
Summarized from City of Austin records · updated Jun 12, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jun 12, 2024
- since Jun 6, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsA reconnect/disconnect for a solar system to existing commercial only. address is located in the etj
A reconnect/disconnect for a solar system to existing commercial only. address is located in the etj
City of Austin permitElectrical PermitWithdrawn- Record
- 2024-072948 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install 144.40 kw rooftop solar system to existing commercial only. address is located in the etj
Install 144.40 kw rooftop solar system to existing commercial only. address is located in the etj
City of Austin permitElectrical PermitFinal- Record
- 2024-070003 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1700 E Slaughter Ln
What is being built at 1700 E Slaughter Ln?
A City of Austin electrical permit indicates a 144.40 kW rooftop solar system for an existing commercial property. Permit 2024-070003 EP was issued June 6, 2024, and its status is Final.
Is a new commercial building planned at 1700 E Slaughter Ln?
The records show a rooftop solar installation for an existing commercial property, not a new building project.
When was the solar permit issued for 1700 E Slaughter Ln?
The permit for the 144.40 kW rooftop solar system was filed June 6, 2024. City of Austin permit 2024-070003 EP has a Final status.
Was a solar reconnect permit filed at 1700 E Slaughter Ln?
Yes. City of Austin permit 2024-072948 EP, filed June 12, 2024, described a reconnect/disconnect for a solar system at the existing commercial property. Its status is Withdrawn.
How large is the solar system at 1700 E Slaughter Ln?
The June 6, 2024 permit describes a 144.40 kW rooftop solar system.
More solar installs in 78747.