2401 E Slaughter Ln

Austin, TX 78747

Goodnight Ranch park-and-ride facilities permitted

Permits at 2401 E Slaughter Ln indicate site lighting, EV and bus charging facilities, and a prefabricated restroom building for Goodnight Ranch Park and Ride. The building permit was filed August 26, 2025, and later permits covered electrical work, plumbing connections, and irrigation through February 13, 2026.

Summarized from City of Austin records · updated Feb 13, 2026

Projects
5
5 filings
Latest filing
Feb 13, 2026
since Aug 20, 2025
Largest scope
—
Listed value
—

Permit & project history

5 projects
  1. New irrigation system for goodnight ranch park and ride

    New irrigation system for goodnight ranch park and ride

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Site electrical site lighting ev and bus changing facilities pre-manufactured restroom building installation and associated connections irrigation system

    Site electrical site lighting ev and bus changing facilities pre-manufactured restroom building installation and associated connections irrigation system

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Site electrical site lighting ev and bus changing facilities pre-manufactured restroom building installation and associated connections irrigation system the correct address 2401 1/2 e slaughter ln permit folder address not able to be revised db -mrt

    Site electrical site lighting ev and bus changing facilities pre-manufactured restroom building installation and associated connections irrigation system the correct address 2401 1/2 e slaughter ln permit folder address not able to be revised db -mrt

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Site electrical site lighting ev and bus changing facilities pre-manufactured restroom building installation and associated connections irrigation system

    Site electrical site lighting ev and bus changing facilities pre-manufactured restroom building installation and associated connections irrigation system

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Construct 2 new driveway approaches of 50 ft (25 ft each) and sidewalk of 300 lf sub contractor- lone star paving(for flat work only)

    Construct 2 new driveway approaches of 50 ft (25 ft each) and sidewalk of 300 lf sub contractor- lone star paving(for flat work only)

    City of Austin permitDriveway / SidewalksExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2401 E Slaughter Ln

What is being built at 2401 E Slaughter Ln?

Permits indicate facilities for Goodnight Ranch Park and Ride, including site lighting, EV and bus charging facilities, and a prefabricated restroom building. The City of Austin building permit is 2025-106921 BP, filed August 26, 2025.

Is a park-and-ride being built at 2401 E Slaughter Ln?

City of Austin permit descriptions refer to Goodnight Ranch Park and Ride. Permitted work includes site lighting, EV and bus charging facilities, a prefabricated restroom building, and irrigation.

What are the permits for at 2401 E Slaughter Ln in Austin?

The permits cover park-and-ride site work and facilities. Records include building permit 2025-106921 BP, electrical permit 2025-106921 EP, and plumbing permit 2025-106921 PP.

When were permits filed for Goodnight Ranch Park and Ride?

The earliest listed permit was filed August 20, 2025, for driveway approaches and sidewalk work. Permits for the site facilities were filed from August 26 through December 5, 2025, and an irrigation permit followed on February 13, 2026.

Will there be a restroom at Goodnight Ranch Park and Ride?

A City of Austin permit description includes installation of a prefabricated restroom building and associated connections. The permit is 2025-106921 PP, filed December 5, 2025.

Do the permits mention EV charging at 2401 E Slaughter Ln?

Yes. The description for building permit 2025-106921 BP includes EV and bus charging facilities, along with site electrical work and lighting.