6008 Rincon St
Austin, TX 78747
6008 Rincon St: 1 project on record
City of Austin lists 1 filing across 1 project at 6008 Rincon St, Austin, TX 78747. The most recent, filed February 12, 2025, covers: “Express: foundation repair- installing 24 ext. & 11 int. pilings”.
Compiled from City of Austin records · updated Feb 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 12, 2025
- since Feb 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress: foundation repair- installing 24 ext. & 11 int. pilings
Express: foundation repair- installing 24 ext. & 11 int. pilings
City of Austin permitBuilding PermitFinal- Record
- 2025-017137 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6008 Rincon St
What is being built at 6008 Rincon St?
The latest filing (City of Austin permit 2025-017137 BP, February 12, 2025) covers express: foundation repair- installing 24 ext. & 11 int. pilings.
How many permits and filings does 6008 Rincon St have?
1 filing across 1 project, from February 12, 2025 to February 12, 2025.
Is there other construction near 6008 Rincon St?
Yes. Nearby filings include 10600 Sunday Dr (install new sprinkler system to small lot, Jul 16, 2024); 10901 Rome Ave (installing ev charger. no meter work austin energy is the electrical provider, Aug 24, 2026); 5912 Bell Tower Ln (disconnect/reconnect * add to: 2024-105352 ep* new um with tesla bus, Dec 4, 2024).
How do I get alerts for new permits at 6008 Rincon St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 10600 Sunday DrJul 16, 2024Install new sprinkler system to small lot · 104 m away
- 10901 Rome AveAug 24, 2026Installing ev charger. no meter work austin energy is the electrical provider · 111 m away
- 5912 Bell Tower LnDec 4, 2024Disconnect/reconnect * add to: 2024-105352 ep* new um with tesla bus · 154 m away
- 10704 Harwood Overlook PassJun 3, 2025We will install a level 2 tesla wall connector back to back from the main panel · 159 m away
- 10509 Sunday DrAug 10, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 180 m away
- 10505 Crescendo LnJun 1, 2026Excavate 19 tunnel to repair main drain line under the house · 182 m away
- 5928 Zachary Scott StSep 11, 2025Express: foundation repair (install 10 push piers) · 188 m away
- 10801 Harwood Overlook PassOct 17, 2024Install level 2 ev charger · 189 m away
- 5905 Zachary Scott StJan 9, 2026Express: foundation repair · 193 m away
- 5924 Zachary Scott StFeb 9, 2024Express: foundation repair · 194 m away
- 5904 Eden DrDec 30, 2024Install evse · 201 m away
- 5805 Southerner WayMay 8, 2026Replacement of complete existing central heat and air system with or without duct work · 215 m away