6924 Derby Downs Dr
Austin, TX 78747
6924 Derby Downs Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6924 Derby Downs Dr, Austin, TX 78747. The most recent, filed September 25, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 25, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 25, 2024
- since Sep 25, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-124861 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6924 Derby Downs Dr
What is being built at 6924 Derby Downs Dr?
The latest filing (City of Austin permit 2024-124861 MP, September 25, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 6924 Derby Downs Dr have?
1 filing across 1 project, from September 25, 2024 to September 25, 2024.
Is there other construction near 6924 Derby Downs Dr?
Yes. Nearby filings include 7000 Derby Downs Dr (replace 35 sewer line from outside the building to the main line, Nov 18, 2025); 8801 Edmundsbury Dr (our scope of work includes performing a direct access drain repair in the garage to correct a damaged section of the underground sanitary drain line. we will saw cut and remove approximately a 3 x 3 section of the garage concrete slab to safely expose the affected piping below. once the drain line is exposed we will remove the damaged 45-degree fitting that has been compromised by root intrusion. the defective fitting will be cut out and replaced with new approved pvc fittings and pipe to restore the integrity of the drainage system. all new connections will be properly aligned solvent welded and installed in accordance with current plumbing code standards. after the repair is complete we will perform a static water test on the drain system to verify the repair is watertight and free of leaks. the system will remain under test for the required plumbing inspection. once the repair has successfully passed inspection we will backfill the excavation with suitable material compact the soil as needed and patch the garage concrete to restore the slab. this estimate includes the plumbing repair concrete removal and replacement backfilling testing and cleanup of the work area. any additional repairs required due to unforeseen conditions or the discovery of additional damaged piping outside the original scope will be discussed with the homeowner prior to proceeding, Aug 14, 2026); 6921 Walkup Ln (express - foundation repair - installing 17 ext & 3 breakouts, Mar 3, 2026).
How do I get alerts for new permits at 6924 Derby Downs Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 7000 Derby Downs DrNov 18, 2025Replace 35 sewer line from outside the building to the main line · 13 m away
- 8801 Edmundsbury DrAug 14, 2026Our scope of work includes performing a direct access drain repair in the garage to correct a damaged section of the underground sanitary drain line. we will saw cut and remove approximately a 3 x 3 section of the garage concrete slab to safely expose the affected piping below. once the drain line is exposed we will remove the damaged 45-degree fitting that has been compromised by root intrusion. the defective fitting will be cut out and replaced with new approved pvc fittings and pipe to restore the integrity of the drainage system. all new connections will be properly aligned solvent welded and installed in accordance with current plumbing code standards. after the repair is complete we will perform a static water test on the drain system to verify the repair is watertight and free of leaks. the system will remain under test for the required plumbing inspection. once the repair has successfully passed inspection we will backfill the excavation with suitable material compact the soil as needed and patch the garage concrete to restore the slab. this estimate includes the plumbing repair concrete removal and replacement backfilling testing and cleanup of the work area. any additional repairs required due to unforeseen conditions or the discovery of additional damaged piping outside the original scope will be discussed with the homeowner prior to proceeding · 45 m away
- 6921 Walkup LnMar 3, 2026Express - foundation repair - installing 17 ext & 3 breakouts · 47 m away
- 6908 Derby Downs DrDec 11, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out · 50 m away
- 8809 Edmundsbury DrMar 31, 202512 tunnel to repair 3 mainline · 68 m away
- 6900 Derby Downs DrMar 6, 2024Austin water violation plumbing permit · 75 m away
- 6924 Walkup LnMar 27, 2024Replacement of complete existing central heat and air system with or without duct work wx rebate & loan · 83 m away
- 8812 Edmundsbury DrJan 10, 2024Replacement of an existing water heater 50-gal electric · 85 m away
- 8816 Edmundsbury DrMar 23, 2026Express- foundation repair. install 29 exterior pilings · 98 m away
- 6904 Walkup LnSep 24, 2026Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 8820 Edmundsbury DrOct 20, 2025Express- stabilization of existing foundation by installing 30 push piers · 109 m away
- 8824 Stambourne StMay 12, 2025Express: foundation repair · 138 m away