9012 Ridgewell Rd
Austin, TX 78747
9012 Ridgewell Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 9012 Ridgewell Rd, Austin, TX 78747. The most recent, filed September 2, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 2, 2025
- since Sep 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-110597 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9012 Ridgewell Rd
What is being built at 9012 Ridgewell Rd?
The latest filing (City of Austin permit 2025-110597 MP, September 2, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 9012 Ridgewell Rd have?
1 filing across 1 project, from September 2, 2025 to September 2, 2025.
Is there other construction near 9012 Ridgewell Rd?
Yes. Nearby filings include 9016 Ridgewell Rd (excavate 12 tunnel to repair main drain line under house, Aug 26, 2026); 9009 Ridgewell Rd (express: foundation repair revision-plumbing work (repair sewer line underneath home), Jun 2, 2026); 6612 Sunderland Trl (main panel replacement no meter - per email from contractor no meter work, May 21, 2026).
How do I get alerts for new permits at 9012 Ridgewell Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 9016 Ridgewell RdAug 26, 2026Excavate 12 tunnel to repair main drain line under house · 15 m away
- 9009 Ridgewell RdJun 2, 2026Express: foundation repair revision-plumbing work (repair sewer line underneath home) · 35 m away
- 6612 Sunderland TrlMay 21, 2026Main panel replacement no meter - per email from contractor no meter work · 70 m away
- 6609 Sunderland TrlNov 2, 2026Re-install meter base that has come unattached from the side of the home · 75 m away
- 8817 Capitol View DrMar 6, 2024Replacement of an existing water heater · 95 m away
- 6620 Sunderland TrlApr 3, 2026Express: foundation repair - install 10 total pilings · 96 m away
- 6621 Sunderland TrlMar 10, 2026Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 6625 Ashen LnNov 9, 2026Express- existing foundation repair as per scope of work attached drawing · 117 m away
- 9009 Capitol View DrNov 6, 2026Marble creek senior · 119 m away
- 9021 Bird Brook LnOct 3, 2025Install new 8.500 kw rooftop solar system for existing residential only · 121 m away
- 8812 Capitol View DrMay 13, 2026Express: replace 7 windows like for like · 131 m away
- 8805 Capitol View DrOct 9, 2026Base: installing a backup battery system and additional meter socket · 132 m away