9217 Independence Loop
Austin, TX 78748
9217 Independence Loop: 1 project on record
City of Austin lists 1 filing across 1 project at 9217 Independence Loop, Austin, TX 78748. The most recent, filed February 3, 2026, covers: “Tunnel up to 20 up to 3 fixtures excavate up to 20 of tunnel under the home to make repairs up to 3 fixtures does not include access pits or any foundation repair. backfill to specs better option for repairing sewer under a slab up to 20 maximum 3 fixtures”.
Compiled from City of Austin records · updated Feb 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 3, 2026
- since Feb 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectTunnel up to 20 up to 3 fixtures excavate up to 20 of tunnel under the home to make repairs up to 3 fixtures does not include access pits or any foundation repair. backfill to specs better option for repairing sewer under a slab up to 20 maximum 3 fixtures
Tunnel up to 20 up to 3 fixtures excavate up to 20 of tunnel under the home to make repairs up to 3 fixtures does not include access pits or any foundation repair. backfill to specs better option for repairing sewer under a slab up to 20 maximum 3 fixtures
City of Austin permitPlumbing PermitFinal- Record
- 2026-010440 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9217 Independence Loop
What is being built at 9217 Independence Loop?
The latest filing (City of Austin permit 2026-010440 PP, February 3, 2026) covers tunnel up to 20 up to 3 fixtures excavate up to 20 of tunnel under the home to make repairs up to 3 fixtures does not include access pits or any foundation repair. backfill to specs better option for repairing sewer under a slab up to 20 maximum 3 fixtures.
How many permits and filings does 9217 Independence Loop have?
1 filing across 1 project, from February 3, 2026 to February 3, 2026.
Is there other construction near 9217 Independence Loop?
Yes. Nearby filings include 9216 Independence Loop (express replace windows like for like, Feb 27, 2024); 9209 Independence Loop (replacement of complete existing central heat and air system with or without duct work replacement of an hvac system, Oct 1, 2026); 9200 Chisholm Ln (relocate main panel and meter can, Apr 19, 2024).
How do I get alerts for new permits at 9217 Independence Loop?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 9216 Independence LoopFeb 27, 2024Express replace windows like for like · 81 m away
- 9209 Independence LoopOct 1, 2026Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system · 92 m away
- 9200 Chisholm LnApr 19, 2024Relocate main panel and meter can · 96 m away
- 9309 Independence LoopJun 16, 20261 access hole in the front of the home and 1 access hole inside the home with repairs on the main line · 121 m away
- 9229 Independence LoopAug 26, 2025Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 9110 Chisholm LnFeb 7, 20209110 chisholm lane subdivision · 134 m away
- 1204 Iron Musket CvNov 4, 2025Request to disconnect upgrade 125a meter to 200a meter for our solar + battery project · 153 m away
- 9321 Independence LoopJul 24, 2026Replacement of complete existing central heat and air system with or without duct work · 154 m away
- 1206 Iron Musket CvMay 15, 2024Express foundation repair · 170 m away
- 9106 Chisholm LnJun 23, 2026New inground pool and spa · 174 m away
- 9302 Independence LoopNov 28, 2023Upgrade existing electrical meter and panel only · 179 m away
- 9104 Chisholm LnApr 21, 2025Install evse · 189 m away