groundranger
Recent · latest filing Jun 2026Residential

9304 Independence Loop

Austin, TX 78748

9304 Independence Loop: 1 project on record

City of Austin lists 1 filing across 1 project at 9304 Independence Loop, Austin, TX 78748. The most recent, filed June 23, 2026, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system”.

Compiled from City of Austin records · updated Jun 23, 2026

Projects
1
1 filings
Latest filing
Jun 23, 2026
since Jun 23, 2026
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system

    Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9304 Independence Loop

What is being built at 9304 Independence Loop?

The latest filing (City of Austin permit 2026-078692 MP, June 23, 2026) covers replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system.

How many permits and filings does 9304 Independence Loop have?

1 filing across 1 project, from June 23, 2026 to June 23, 2026.

What is being built near Austin Independent School District in Austin?

9304 Independence Loop is about 166 m from Austin Independent School District (9400 Texas Oaks Dr). Its latest filing is for replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system.

Is there other construction near 9304 Independence Loop?

Yes. Nearby filings include 9302 Independence Loop (upgrade existing electrical meter and panel only, Nov 28, 2023); 9306 Independence Loop (technician on site came out and ran camera throughout customers entire sewer system where we learned there are multiple breaks throughout the sewer including under the home and in the yard. technicians are offering an entire sewer renovation in order to correct all issues under the home. technicians learned that the shower line has completely snapped off and does not functional as well as the other breaks throughout the home. this estimate covers the labor and material cost in order to complete said job. this quote does not include if heavy rock or root charges that may occur during the dig. this estimate does have a 10 year bumper-to-bumper warranty but does not cover ground shifting and or foundation work, Oct 24, 2025); 9321 Independence Loop (replacement of complete existing central heat and air system with or without duct work, Jul 24, 2026).

How do I get alerts for new permits at 9304 Independence Loop?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78748
Get alerts for 9304 Independence Loop