4415 Tello Path
Austin, TX 78749
4415 Tello Path: 1 project on record
City of Austin lists 1 filing across 1 project at 4415 Tello Path, Austin, TX 78749. The most recent, filed August 22, 2025, covers: “Full underground service meter panel”.
Compiled from City of Austin records · updated Aug 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 22, 2025
- since Aug 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectFull underground service meter panel
Full underground service meter panel
City of Austin permitElectrical PermitFinal- Record
- 2025-105121 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4415 Tello Path
What is being built at 4415 Tello Path?
The latest filing (City of Austin permit 2025-105121 EP, August 22, 2025) covers full underground service meter panel.
How many permits and filings does 4415 Tello Path have?
1 filing across 1 project, from August 22, 2025 to August 22, 2025.
Is there other construction near 4415 Tello Path?
Yes. Nearby filings include 4404 Tello Path (express: replace 12 existing windows, May 13, 2025); 4425 Chickasaw Ct (disconnect/reconnect of service upgrading main service panel from 125amp to 200amps installing ev charger, Jun 12, 2025); 4421 Chickasaw Ct (replacement of complete existing central heat and air system with or without duct work, Jun 26, 2025).
How do I get alerts for new permits at 4415 Tello Path?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 4404 Tello PathMay 13, 2025Express: replace 12 existing windows · 74 m away
- 4425 Chickasaw CtJun 12, 2025Disconnect/reconnect of service upgrading main service panel from 125amp to 200amps installing ev charger · 87 m away
- 4421 Chickasaw CtJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 4400 Tello PathFeb 26, 2025Drain and remove old water heaters repipe the water lines install new pan and drain line install expansion tank with vacuum breaker. 30 amp break upgrade wiring to the hybrid water heater · 89 m away
- 4501 Steed DrAug 5, 2026Replacement of an existing water heater 40 gallon nat gas water heater replacement · 96 m away
- 4413 Chickasaw CtOct 15, 2026Install roof-mounted solar system on existing residence · 101 m away
- 4513 Tello PathFeb 29, 2024Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 4529 Norman TrlSep 12, 2025Express: replacing 4 windows like for like · 121 m away
- 4612 Steed DrNov 3, 2026Install new 13.5kw energy storage system for existing residential only · 135 m away
- 4604 Norman TrlSep 29, 2025Interior remodel master bath: freestanding tub larger shower pan wider niche new window 2 gfcis new lights switches exhaust same-location plumbing fixtures. guest bath: wider niche 1 gfci center sink new exhaust light switch · 142 m away
- 4616 Steed DrAug 6, 2025Replacement of complete existing central heat and air system with or without duct work replace (2) vertical gas systems · 152 m away
- 4617 Steed DrMay 8, 2026Replacement of an existing water heater replace 50-gallon gas water heater located in garage · 158 m away