4908 Wing Rd
Austin, TX 78749
4908 Wing Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 4908 Wing Rd, Austin, TX 78749. The most recent, filed June 2, 2026, covers: “Install a new water service line up to 30 feet yard line 4908 wing road austin tx 78749”.
Compiled from City of Austin records · updated Jun 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2026
- since Jun 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall a new water service line up to 30 feet yard line 4908 wing road austin tx 78749
Install a new water service line up to 30 feet yard line 4908 wing road austin tx 78749
City of Austin permitPlumbing PermitActive- Record
- 2026-069172 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4908 Wing Rd
What is being built at 4908 Wing Rd?
The latest filing (City of Austin permit 2026-069172 PP, June 2, 2026) covers install a new water service line up to 30 feet yard line 4908 wing road austin tx 78749.
How many permits and filings does 4908 Wing Rd have?
1 filing across 1 project, from June 2, 2026 to June 2, 2026.
Is there other construction near 4908 Wing Rd?
Yes. Nearby filings include 4910 Wing Rd (replacement of complete existing central heat and air system with or without duct work hvac changeout, Dec 8, 2025); 4904 Wing Rd (repair main water service line from house to meter upgrading line size and addition of accessible shut off valve, Apr 30, 2026); 4907 Summerset Trl (replacement of complete existing central heat and air system with or without duct work, Oct 31, 2024).
How do I get alerts for new permits at 4908 Wing Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 4910 Wing RdDec 8, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout · 22 m away
- 4904 Wing RdApr 30, 2026Repair main water service line from house to meter upgrading line size and addition of accessible shut off valve · 38 m away
- 4907 Summerset TrlOct 31, 2024Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 5001 Summerset TrlMay 10, 2024Upgrade overhead 200 amp electrical service · 40 m away
- 4907 Wing RdMay 8, 2026Replace water service from meter to house · 58 m away
- 4902 Wing RdMay 22, 2024Replacement of an existing water heater · 60 m away
- 5000 Wing RdDec 22, 2025Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 4905 Wing RdAug 22, 2025Express: tub-to-shower conversion · 71 m away
- 5002 Wing RdMar 17, 2025Replacement of an existing water heater · 85 m away
- 4901 Summerset TrlNov 1, 2024Replacement of complete existing central heat and air system with or without duct work replace existing hvac system and install a lennox 3.5 ton gas upflow · 89 m away
- 4902 Dry Oak TrlJun 16, 2025Replacement of an existing water heater replacing 40gal gas water heater · 91 m away
- 5002 Summerset TrlSep 16, 2026Express: replace the existing exterior sliding door with an inswing door of the same size · 105 m away