5646 Wagon Train Rd
Austin, TX 78749
Home battery system and electrical panel upgrade
City of Austin permits filed January 15, 2026, indicate installation of a new 13.5 kW energy storage system at the existing residence at 5646 Wagon Train Rd. A second permit covers disconnecting and reconnecting the electrical service to upgrade the main distribution panel.
Summarized from City of Austin records · updated Jan 15, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 15, 2026
- since Jan 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstall new 13.5 kw energy storage system for existing residential only
Install new 13.5 kw energy storage system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2026-005100 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect/reconnect to upgrade main distribution panel
Disconnect/reconnect to upgrade main distribution panel
City of Austin permitElectrical PermitFinal- Record
- 2026-005111 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5646 Wagon Train Rd
What work is planned at 5646 Wagon Train Rd?
City of Austin permits indicate a new 13.5 kW energy storage system and an upgrade to the main electrical distribution panel. Both permits were filed January 15, 2026.
Is a battery system being installed at 5646 Wagon Train Rd?
Yes. Permit 2026-005100 EP covers installation of a new 13.5 kW energy storage system for the existing residence.
What electrical work is permitted at 5646 Wagon Train Rd in Austin?
Two electrical permits cover a 13.5 kW energy storage system and disconnecting and reconnecting the service to upgrade the main distribution panel. Both were filed January 15, 2026.
When were the permits filed for 5646 Wagon Train Rd?
The City of Austin filed both permits on January 15, 2026. They are 2026-005100 EP and 2026-005111 EP.
Is a new building being constructed at 5646 Wagon Train Rd?
The permits describe work at an existing residence: installation of an energy storage system and an electrical panel upgrade. They do not indicate construction of a new building.
Also being built nearby
All of 78749- 5654 Wagon Train RdMay 16, 2024Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 7403 Ladle LnOct 19, 2026Base: installing a backup battery system and additional meter socket · 80 m away
- 5633 Wagon Train RdApr 21, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage vertical gas system · 94 m away
- 7500 Vol Walker DrNov 10, 2025Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 5657 Wagon Train RdMar 24, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 7400 Ladle LnJul 29, 2024Nema plug install in the garage · 131 m away
- 7515 Ladle LnOct 22, 2026Express - replace siding on home. property has electrical box on house electrical permit is a child of the building permit · 131 m away
- 7607 Hawkeye DrMar 30, 2026Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 7510 Ladle LnMay 22, 2024Irrigation system installation · 136 m away
- 7400 Vol Walker DrMar 27, 2026Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 7611 Hawkeye DrJun 29, 2026Replacement of an existing water heater replace 40-gallon gas water heater location: garage · 140 m away
- 5732 Abilene TrlJan 3, 2025Replacement of an existing water heater · 157 m away