1011 E 53rd Half St
Austin, TX 78751
Electrical service equipment replacement permitted in Austin
City of Austin permits indicate electrical service equipment is being replaced at 1011 E 53rd Half St. The building and electrical permits were filed June 22, 2026, for a 400-amp service disconnect, new metering equipment and a consolidated distribution panel; both are marked final.
Summarized from City of Austin records · updated Jun 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 22, 2026
- since Jun 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplace existing metering equipment with new transocket meter install 400 amp service disconnect remove 3 federal pacific disconnects and 2 federal pacific panels and consolidate loads into a single new distribution panel
Replace existing metering equipment with new transocket meter install 400 amp service disconnect remove 3 federal pacific disconnects and 2 federal pacific panels and consolidate loads into a single new distribution panel
City of Austin permitBuilding PermitFinal- Record
- 2026-078423 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace existing metering equipment with new transocket meter install 400 amp service disconnect remove 3 federal pacific disconnects and 2 federal pacific panels and consolidate loads into a single new distribution panel
Replace existing metering equipment with new transocket meter install 400 amp service disconnect remove 3 federal pacific disconnects and 2 federal pacific panels and consolidate loads into a single new distribution panel
City of Austin permitElectrical PermitFinal- Record
- 2026-078423 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1011 E 53rd Half St
What is being built at 1011 E 53rd Half St?
City of Austin permits describe replacement metering equipment, a 400-amp service disconnect and a new distribution panel. The work also removes three Federal Pacific disconnects and two Federal Pacific panels.
When was the electrical work at 1011 E 53rd Half St permitted?
The City of Austin building permit 2026-078423 BP and electrical permit 2026-078423 EP were filed June 22, 2026. Both are marked final.
Is a new building going up at 1011 E 53rd Half St?
The available permits describe electrical equipment replacement and load consolidation, not construction of a new building.
What electrical upgrades are planned at 1011 E 53rd Half St?
The permit description calls for new metering equipment, a 400-amp service disconnect and one new distribution panel to consolidate loads.
What work is permitted near Milano Nail Spa in Austin?
At 1011 E 53rd Half St, about 274 meters from Milano Nail Spa, City of Austin permits filed June 22, 2026, describe electrical service equipment replacement and load consolidation.
Also being built nearby
All of 78751- 5303 Harmon AveFeb 10, 2009Bliss subdivision, the (a resub of ridgetop, lot 1a of the resub of part 1 of lo — the bliss, ridgetop subd of lot 1a - resub of part of lot 1 block o · 56 m away
- 5526 N IH 35 Svrd SbMay 19, 2026Fill-in of the existing jacuzzi to be converted into a sidewalk/patio area. 2026 016077 da - approved · 81 m away
- 5610 N IH 35 Svrd SbJun 24, 2025Interior non-structural demolition 48 a.f.f. to ceiling 46 feet sub panel upgrade to 125a/3p installation of 16 (new) outlets installation of (2) (new) domestic cold water stub out from existing supply (1) (new) domestic hot water stub out from existing supply relocation of (1) domestic hot water & domestic cold water on same wall · 93 m away
- 5660 N IH 35 Svrd SbMar 8, 2024Interior remodel to existing hotel level 6 · 101 m away
- 5317 Harmon AveApr 27, 2026Express: convert bathtub to walk in shower · 114 m away
- 946 E 53rd StMay 23, 2024Relocate subpanel on adu · 118 m away
- 944 E 53rd StMay 14, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 5319 Harmon AveJan 16, 2024Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 5401 Harmon AveJun 1, 2026Express: like-for-like window replacement siding repair · 143 m away
- 932 E 53rd Half StFeb 19, 2026Gas test · 153 m away
- 5403 Harmon AveApr 18, 2025Express: foundation repair · 157 m away
- 930 E 53rd Half StJul 16, 2026Upgrade electrical service to 200a · 171 m away