312 E 54th St
Austin, TX 78751
312 E 54th St: 1 project on record
City of Austin lists 1 filing across 1 project at 312 E 54th St, Austin, TX 78751. The most recent, filed August 25, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Aug 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 25, 2025
- since Aug 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-105483 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 312 E 54th St
What is being built at 312 E 54th St?
The latest filing (City of Austin permit 2025-105483 EP, August 25, 2025) covers install evse.
How many permits and filings does 312 E 54th St have?
1 filing across 1 project, from August 25, 2025 to August 25, 2025.
Is there other construction near 312 E 54th St?
Yes. Nearby filings include 311 E 54th St (nema 14-50 3r powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <15 feet new 3/4 emt conduit to power the nema 14-50 3r at 40amp constant draw, Apr 10, 2026); 5315 Avenue G (install new irrigation in an old existing home, Oct 26, 2026); 5412 Avenue H (replacement of complete existing central heat and air system with or without duct work kady dunlap - replacing like for like 2t gas horizontal, Oct 14, 2025).
How do I get alerts for new permits at 312 E 54th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 311 E 54th StApr 10, 2026Nema 14-50 3r powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <15 feet new 3/4 emt conduit to power the nema 14-50 3r at 40amp constant draw · 30 m away
- 5315 Avenue GOct 26, 2026Install new irrigation in an old existing home · 40 m away
- 5412 Avenue HOct 14, 2025Replacement of complete existing central heat and air system with or without duct work kady dunlap - replacing like for like 2t gas horizontal · 52 m away
- 5402 Avenue HJul 8, 2026Replace approximately 25ft of main sewer line under pier and beam home. no digging no drywall removal and we are not touching the floor or structure · 52 m away
- 5313 Avenue GMay 28, 2024Construct new driveway approach 12 ft. fee in lieu of sidewalk paid · 53 m away
- 5311 Avenue GNov 6, 2026We plan to install 14.960 kw dc roof mount solar pv system with (34) hyundai solar: his-t440nf(bk) 440w pv modules along with (1) tesla: powerwall 3 (1707000-21-y) · 62 m away
- 5407 Avenue HNov 3, 2026Base: installing a backup battery system and additional meter socket · 65 m away
- 5409 Avenue GJun 18, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 75 m away
- 5406 Avenue GJul 10, 2024Install electric range circuit · 79 m away
- 5310 Avenue GFeb 4, 2026New construction of detached 1-car carport · 81 m away
- 5411 Avenue GJun 18, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 81 m away
- 5413 Avenue GJul 23, 2025Reroute washer drain from current location to new location as well as rerouting gas lines from dryer to new laundry room location 5413 avenue g austin tx 78751 · 91 m away