407 E 45th St

Austin, TX 78751

Drain-line and electrical repairs at 407 E 45th St

Permits indicate drain-line and electrical repairs at 407 E 45th St, not a new addition. The electrical permit was filed September 11, 2024, and the plumbing permit for replacing about 100 feet of drain lines was filed February 26, 2025.

Summarized from City of Austin records · updated Feb 26, 2025

Projects
2
2 filings
Latest filing
Feb 26, 2025
since Sep 11, 2024
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Tunnel approx. 100 feet of drain lines total (4 different tunnels equaling 100 feet) replacing pipes underneath no new additions pulling cast iron & putting in pvc. doing 4 total sections in same building section at a time to avoid residents interruptions

    Tunnel approx. 100 feet of drain lines total (4 different tunnels equaling 100 feet) replacing pipes underneath no new additions pulling cast iron & putting in pvc. doing 4 total sections in same building section at a time to avoid residents interruptions

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Repair made on disconnect a phase lug burnt out replaced main breaker disconnect box like for like

    Repair made on disconnect a phase lug burnt out replaced main breaker disconnect box like for like

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 407 E 45th St

What is happening at 407 E 45th St in Austin?

City of Austin permits describe electrical repairs and replacement of drain lines at the property. The records do not describe a new addition.

Is a new building being built at 407 E 45th St?

The available permits describe repair work, not new construction. They cover an electrical repair and drain-line replacement.

What plumbing work is planned at 407 E 45th St?

Permit 2025-016895 PP, filed February 26, 2025, describes tunneling in four sections to replace about 100 feet of drain lines beneath the building.

What electrical work was permitted at 407 E 45th St?

Permit 2024-109206 EP, filed September 11, 2024, describes replacing a burnt phase lug and the main breaker disconnect box like for like.

When were permits filed for work at 407 E 45th St?

The electrical permit was filed September 11, 2024, and the plumbing permit was filed February 26, 2025. Both City of Austin permits are listed as final.