602 E 46th St
Austin, TX 78751
Central heating and air system replacement permitted
A permit at 602 E 46th St covers replacement of the existing central heating and air system, with or without ductwork. The City of Austin issued the mechanical permit on September 10, 2026; the record is marked final.
Summarized from City of Austin records · updated Sep 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2026
- since Sep 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-118121 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 602 E 46th St
What is being done at 602 E 46th St in Austin?
A City of Austin mechanical permit covers replacement of the existing central heat and air system, with or without ductwork.
When was the HVAC replacement at 602 E 46th St permitted?
The permit was filed on September 10, 2026. It is permit 2026-118121 MP and is marked final.
Is a new building being built at 602 E 46th St?
The permit record describes replacement of an existing central heating and air system, not construction of a new building.
Does the permit at 602 E 46th St include ductwork?
The permit description says the system replacement may be with or without ductwork; it does not specify which applies.
What is the status of permit 2026-118121 MP?
The City of Austin record lists the mechanical permit as final. It was filed on September 10, 2026.
Also being built nearby
All of 78751- 604 E 46th StOct 27, 2026Total demolition of 375 sq ft detached garage circa 1947 · 15 m away
- 603 E 46th StNov 25, 2025We plan to install 5.280 kw dc roof mount solar pv system with 12 - seg solar: seg-440-btd-bg 440w pv modules with 12 - enphase iq8a-72-2-us 349w micro inverters equipped with rapid shutdown · 37 m away
- 601 E 46th StJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 605 E 46th StJun 22, 2026Addition and remodel to existing single family residence to add a bedroom and restroom. retroactive permit of wood deck and kitchen addition with the noncomplying portion in the 5-foot side yard setback to be removed for compliance · 50 m away
- 608 E 46th StApr 28, 2026Install 22kw home standby generator · 51 m away
- 4604 Eilers AveMay 14, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <90 feet new emt conduit to power the level 2 ev charger at 48amp constant draw · 63 m away
- 4606 Evans AveJan 4, 2024Per tx gas- relocate gas meter away from electric panel tankless water heater ac unit and window · 67 m away
- 4517 Evans AveJun 18, 2025Upgrading a duplex service from 100a to 200a · 70 m away
- 610 E 46th StMar 16, 2026This is a backflow doublecheck replacement to an existing irrigation system · 71 m away
- 4602 Eilers AveJul 24, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <10 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw · 73 m away
- 605 E 47th StJun 3, 2026Interior remodel - replace bath valves change light fixtures update electrical install lvl beam · 80 m away
- 607 E 47th StSep 11, 2024New irrigation · 85 m away