805 E 48th St: 1 project on record
City of Austin lists 1 filing across 1 project at 805 E 48th St, Austin, TX 78751. The most recent, filed September 5, 2025, covers: “Main sewer line from city tap to homeowner cleanout”.
Compiled from City of Austin records · updated Sep 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 5, 2025
- since Sep 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectMain sewer line from city tap to homeowner cleanout
Main sewer line from city tap to homeowner cleanout
City of Austin permitPlumbing PermitFinal- Record
- 2025-112545 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 805 E 48th St
What is being built at 805 E 48th St?
The latest filing (City of Austin permit 2025-112545 PP, September 5, 2025) covers main sewer line from city tap to homeowner cleanout.
How many permits and filings does 805 E 48th St have?
1 filing across 1 project, from September 5, 2025 to September 5, 2025.
Is there other construction near 805 E 48th St?
Yes. Nearby filings include 4705 Caswell Ave (direct access drain system repair a direct access entry point will be created on the left side of the front door to access the existing drain system. once access is established the existing drain lines will be removed and replaced with new schedule 40 pvc dwv (drain waste and vent) piping and fittings. all connections will be made in accordance with current plumbing code requirements ensuring proper flow and long-term durability. the system will be tested upon completion to verify functionality and leak-free operation, Jun 23, 2025); 813 E 48th St (total demolition of sfr 1872 sq ft circa 1949 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage, Oct 30, 2026); 4708 Caswell Ave (building. 2: new secondary unit with 2 bedrooms and 1.5 bathrooms, Sep 28, 2026).
How do I get alerts for new permits at 805 E 48th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 4705 Caswell AveJun 23, 2025Direct access drain system repair a direct access entry point will be created on the left side of the front door to access the existing drain system. once access is established the existing drain lines will be removed and replaced with new schedule 40 pvc dwv (drain waste and vent) piping and fittings. all connections will be made in accordance with current plumbing code requirements ensuring proper flow and long-term durability. the system will be tested upon completion to verify functionality and leak-free operation · 58 m away
- 813 E 48th StOct 30, 2026Total demolition of sfr 1872 sq ft circa 1949 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 62 m away
- 4708 Caswell AveSep 28, 2026Building. 2: new secondary unit with 2 bedrooms and 1.5 bathrooms · 63 m away
- 4714 Caswell AveSep 5, 2024Replace hot and cold water lines under pier and beam house. dig up and replace water line from house to street · 75 m away
- 812 E 48th StMay 6, 2024Express: replace 2 windows - like for like · 76 m away
- 810 E 47th StSep 4, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 93 m away
- 4808 Red River StJul 24, 2026Repairing kitchen drain line under the slab · 98 m away
- 4709 Red River StAug 20, 2024Upgrade tank to tankless wh · 102 m away
- 4710 Red River StSep 19, 2025Replacement of an existing water heater · 102 m away
- 804 E 47th StMar 26, 2026Replacement of an existing water heater install water heater tankless change out 804 east 47th street #apt d austin tx 78751 · 102 m away
- 812 E 47th StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 4802 Caswell AveMay 27, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton electric heat pump system · 105 m away