928 E 53rd Half St

Austin, TX 78751

EV charger, solar system and HVAC work at 928 E 53rd Half St

City of Austin permits record an EV charger and a 3.08-kW solar PV system at this residential address in August and September 2026. An earlier permit, filed October 3, 2025, covers replacement of the central heating and air system.

Summarized from City of Austin records · updated Sep 3, 2026

Projects
3
3 filings
Latest filing
Sep 3, 2026
since Oct 3, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Installation of ev charger

    Installation of ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of 3.08kw solar pv system

    Installation of 3.08kw solar pv system

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of complete existing central heat and air system with or without duct work 1 system: 2.5-ton 14 seer friedrich hp

    Replacement of complete existing central heat and air system with or without duct work 1 system: 2.5-ton 14 seer friedrich hp

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 928 E 53rd Half St

What work is permitted at 928 E 53rd Half St in Austin?

City of Austin records list an EV charger installation, a 3.08-kW solar PV system and replacement of the central heating and air system.

Is solar being installed at 928 E 53rd Half St?

Yes. Electrical Permit 2026-111537 EP, filed August 28, 2026, covers installation of a 3.08-kW solar PV system. The permit status is Final.

Is an EV charger being installed at 928 E 53rd Half St?

Yes. Electrical Permit 2026-113892 EP, filed September 3, 2026, covers installation of an EV charger. The permit status is Final.

When was the HVAC system replacement permitted at this address?

The mechanical permit was filed October 3, 2025. It covers replacement of the existing central heat and air system with a 2.5-ton, 14-SEER Friedrich heat pump.

What are the permit numbers for work at 928 E 53rd Half St?

The records list permits 2026-113892 EP for the EV charger, 2026-111537 EP for the solar PV system and 2025-125044 MP for the heating and air system replacement.