928 E 53rd Half St
Austin, TX 78751
EV charger, solar system and HVAC work at 928 E 53rd Half St
City of Austin permits record an EV charger and a 3.08-kW solar PV system at this residential address in August and September 2026. An earlier permit, filed October 3, 2025, covers replacement of the central heating and air system.
Summarized from City of Austin records · updated Sep 3, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 3, 2026
- since Oct 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsInstallation of ev charger
Installation of ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-113892 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of 3.08kw solar pv system
Installation of 3.08kw solar pv system
City of Austin permitElectrical PermitFinal- Record
- 2026-111537 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work 1 system: 2.5-ton 14 seer friedrich hp
Replacement of complete existing central heat and air system with or without duct work 1 system: 2.5-ton 14 seer friedrich hp
City of Austin permitMechanical PermitFinal- Record
- 2025-125044 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 928 E 53rd Half St
What work is permitted at 928 E 53rd Half St in Austin?
City of Austin records list an EV charger installation, a 3.08-kW solar PV system and replacement of the central heating and air system.
Is solar being installed at 928 E 53rd Half St?
Yes. Electrical Permit 2026-111537 EP, filed August 28, 2026, covers installation of a 3.08-kW solar PV system. The permit status is Final.
Is an EV charger being installed at 928 E 53rd Half St?
Yes. Electrical Permit 2026-113892 EP, filed September 3, 2026, covers installation of an EV charger. The permit status is Final.
When was the HVAC system replacement permitted at this address?
The mechanical permit was filed October 3, 2025. It covers replacement of the existing central heat and air system with a 2.5-ton, 14-SEER Friedrich heat pump.
What are the permit numbers for work at 928 E 53rd Half St?
The records list permits 2026-113892 EP for the EV charger, 2026-111537 EP for the solar PV system and 2025-125044 MP for the heating and air system replacement.
Also being built nearby
All of 78751- 930 E 53rd Half StJul 16, 2026Upgrade electrical service to 200a · 19 m away
- 924 E 53rd Half StOct 4, 2024Ev charger install · 34 m away
- 932 E 53rd Half StFeb 19, 2026Gas test · 38 m away
- 927 E 54th StJul 21, 2026Service line was taken out by a tree. replacing wire weather head and meter hub · 46 m away
- 926 E 54th StMar 5, 2024Trench in front yard to locate water yard line. trench to carport to relocate water yard line for new filtration system. standalone permit- no remodeling or working with gc · 84 m away
- 934 E 54th StJun 27, 2025Replacement of complete existing central heat and air system with or without duct work hallway through scuttle · 100 m away
- 932 E 53rd StMay 22, 2026New pool for single family residence (with plumbing permit) · 117 m away
- 906 E 53rd Half StSep 18, 2026Replacement of an existing water heater front house on property change out of ng water heater like for like · 125 m away
- 907 E 54th StJul 28, 2025Express - foundation repair · 127 m away
- 944 E 53rd StMay 14, 2025Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 908 E 54th StMay 15, 2025Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 946 E 53rd StMay 23, 2024Relocate subpanel on adu · 137 m away
More solar installs in 78751.