405 Denson Dr
Austin, TX 78752 · Austin Independent School District
405 Denson Dr school adds secure entry vestibule
Permits filed in June and July 2025 describe enclosing an existing entry corridor at the school to create a secure vestibule and secure the reception area. The work also includes security hardware to help control access to the school’s interior.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jul 16, 2025
- Projects
- 7
- 7 filings
- Latest filing
- Jul 16, 2025
- since Mar 2, 2007
- Largest scope
- 610 sf
- Estimated cost
- $227K
- state registration
Permit & project history
7 projectsEnclosing existing entry corridor to create secure vestibule securing existing reception area to improve control over access tointerior of school addition of security hardware to new vestibulespace and reception
Enclosing existing entry corridor to create secure vestibule securing existing reception area to improve control over access tointerior of school addition of security hardware to new vestibulespace and reception
City of Austin permitMechanical PermitFinal- Record
- 2025-071705 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing entry corridor to create secure vestibule securing existing reception area to improve control over access tointerior of school addition of security hardware to new vestibulespace and reception
Enclosing existing entry corridor to create secure vestibule securing existing reception area to improve control over access tointerior of school addition of security hardware to new vestibulespace and reception
City of Austin permitElectrical PermitFinal- Record
- 2025-071705 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing entry corridor to create secure vestibule securing existing reception area to improve control over access tointerior of school addition of security hardware to new vestibulespace and reception
Enclosing existing entry corridor to create secure vestibule securing existing reception area to improve control over access tointerior of school addition of security hardware to new vestibulespace and reception
City of Austin permitBuilding PermitFinal- Record
- 2025-071705 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Creating a secure vestibule with new entry into reconfigured admin space. addition of security hardware to new vestibule space and reception area. — reilly elementary school
TDLR project registrationRenovation/AlterationProject Closed610 sq ft$227K est.- Project #
- TABS2024025856
- Tenant / owner
- Secure Vestibule At Reilly Elementary School
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 405 Denson Dr
What is being built at 405 Denson Dr in Austin?
Permits describe a secure entry vestibule made by enclosing an existing corridor at the school. The work also secures the existing reception area.
When was the secure vestibule permitted at 405 Denson Dr?
The building permit, 2025-071705 BP, was filed June 23, 2025. Electrical and mechanical permits followed on June 25 and July 16, 2025.
Is this a new school at 405 Denson Dr?
The 2025 permits describe changes to an existing school entry and reception area, not construction of a new school.
What security work is planned at the school on Denson Drive?
The permit descriptions call for enclosing an existing entry corridor, securing the reception area and adding security hardware to the new vestibule space.
What are the permit numbers for work at 405 Denson Dr?
The related City of Austin permits are 2025-071705 BP for building work, 2025-071705 EP for electrical work and 2025-071705 MP for mechanical work.
Also being built nearby
All of 78752- 500 Denson DrNov 6, 2026Replace interior hot and cold water lines with uponor pex pipe. replace main water line from city lead to home · 70 m away
- 6201 Guadalupe StMay 7, 2024Replace cast iron drain lines under building and out to city tap. drain lines will be re-routed to back of the building · 98 m away
- 109 Denson DrNov 4, 2026Replace unit b meter socket due to thermal damage · 108 m away
- 503 Hammack DrMay 24, 2026Replacement of complete existing central heat and air system with or without duct work replacement of a/c and heating system equipment only 16 seer ruud system · 129 m away
- 6210 Guadalupe StJul 14, 2026Construct new driveway approach of 10 ft. no sidewalk inspection per plan review · 129 m away
- 507 Hammack DrMay 21, 2026Replacing the piping under the house · 141 m away
- 301 Hammack DrFeb 5, 2024Request to disconnect main electrical service upgrade · 151 m away
- 406 Hammack DrSep 30, 2024Contractor contacted us to do a test gas because texas gas required an inspection from the city · 164 m away
- 404 Hammack DrMar 31, 2026Replace drain line drain line under bathroom via tunnel · 166 m away
- 502 Hammack DrJul 2, 2026Replace main sewer line · 169 m away
- 605 Hammack DrMay 28, 2025Replacing water service line sewer and drains underneath pier and beam house and sewer line in back yard. water service is in the front yard · 180 m away
- 600 Hammack DrMar 20, 2024Replacement of complete existing central heat and air system with or without duct work · 196 m away