700 Denson Dr
Austin, TX 78752
Multifamily site plan approved at 700 Denson Dr
A multifamily site development plan at 700 Denson Dr was approved and released by the City of Austin on June 20, 2025. A separate sidewalk and curb-and-gutter permit was finalized on January 30, 2025.
Summarized from City of Austin records · updated Jun 20, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jun 20, 2025
- since Mar 27, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsConstruct new sidewalk of 59 lf and curb & gutter of 32 ft
Construct new sidewalk of 59 lf and curb & gutter of 32 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2023-016193 DS
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction of 6 3-story condos parking first floor for all 6 condos. sp-2021-0046c - approved
New construction of 6 3-story condos parking first floor for all 6 condos. sp-2021-0046c - approved
City of Austin permitMechanical PermitFinal- Record
- 2023-016193 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction of 6 3-story condos parking first floor for all 6 condos. sp-2021-0046c - approved
New construction of 6 3-story condos parking first floor for all 6 condos. sp-2021-0046c - approved
City of Austin permitElectrical PermitFinal- Record
- 2023-016193 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 700 Denson Dr
What is being planned at 700 Denson Dr in Austin?
A City of Austin case identifies a multifamily site development plan for the address. The plan was approved and released on June 20, 2025.
Was the 700 Denson Dr multifamily plan approved?
Yes. City of Austin case 12639589 shows the site development plan as “Approved and Released” on June 20, 2025.
When was the site plan for 700 Denson Dr filed?
The City of Austin case is dated June 20, 2025, and lists the plan as approved and released.
How many apartments are planned at 700 Denson Dr?
The available City of Austin record identifies a multifamily site development plan but does not state the number of apartments.
Has construction started at 700 Denson Dr?
The records provided show an approved site development plan, but do not establish whether construction has started.
What sidewalk work was permitted at 700 Denson Dr?
Permit 2023-016193 DS covers a new 59-foot sidewalk and 32 feet of curb and gutter. The permit was finalized on January 30, 2025.
Also being built nearby
All of 78752- 617 Hammack DrFeb 4, 2025Replacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas - tight fit · 86 m away
- 6205 Lamar BlvdDec 5, 2008Higdon addition — higdon addition · 112 m away
- 6205 N Lamar BlvdFeb 16, 2026We will be removing the existing failing grease interceptor and installing a new codecompliant grease trap in the same general location. work includes excavation demolition of the existing interceptor installation of new piping connections setting the new interceptor and restoring the work area to grade. detailed scope: excavate to expose the existing grease trap and associated inlet/outlet piping. disconnect and remove the existing grease interceptor including damaged or noncompliant piping sections. install a new (cityapproved) grease interceptor sized per fixture count and city of austin industrial waste requirements. set the new unit on a properly compacted and leveled base. reconnect all inlet and outlet plumbing using approved materials and fittings. install new cleanouts as required by current code. ensure proper flow line elevations and venting per austin water and upc/ipc requirements. backfill and compact the excavation area; restore concrete/asphalt or surface material as needed. perform final testing for watertightness flow and proper operation. submit required saws/industrial waste documentation including asbuilt information and fixture count verification. no changes to existing building water distribution or sewer layout beyond the grease trap connections. all work will comply with city of austin plumbing code industrial waste regulations and whataburger operational safety requirements · 112 m away
- 709 Lamar PlMar 2, 2007709 lamar place subdivision — 709 lamar place subdivision · 114 m away
- 6215 N Lamar BlvdJul 31, 2026Per tx gas they are going to repair a gas leak on their line and while the line is temporarily down they want us to move the gas meter 10 feet out to the edge of the building and remove from the covered location its currently at · 117 m away
- 6221 Lamar BlvdMay 26, 20266221 north lamar multifamily · 127 m away
- 721 Lamar PlAug 7, 2026Total demolition of 8770 sq ft multi-family building circa 1972.the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 133 m away
- 609 Hammack DrOct 16, 2024New full lawn irrigation install · 138 m away
- 6309 Burns StFeb 17, 2025Rebuild 30 meter bank electrical service on north rear side of building rebuild 6 meter bank electrical service on north middle side of building. rebuild 6 meter bank electrical service on south rear side of building - all exterior work only · 146 m away
- 615 Wilmes DrAug 19, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 156 m away
- 6301 Lamar BlvdMar 2, 2007Shell convenience store · 157 m away
- 613 Wilmes DrOct 13, 2025Installation of a new irrigation system for a single-family residence. the system is designed to provide efficient and uniform water coverage for all landscape areas including front side and backyard zones. work will include trenching installation of pvc piping control valves spray and rotor heads and a weather-based smart irrigation controller. the system will be connected to the existing potable water supply with an approved backflow prevention assembly installed per city of austin and tceq requirements. all components and installation methods will comply with current city of austin irrigation codes manufacturer specifications and best practices to ensure proper water conservation and system performance · 165 m away