7802 Southwest Loop
Benbrook, TX 75244 · Jackson Shaw / Benbrook North, LP
Office finish-out planned at Chisholm 20 industrial facility
A roughly 4,899-square-foot office and support-area finish-out was registered for an existing industrial facility at 7802 Southwest Loop. The TDLR project registration was filed January 16, 2024, and describes work inside Chisholm 20 Building 1. The applicant estimated the project cost at $1.1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 16, 2024
- since Jan 16, 2024
- Largest scope
- 4,899 sf
- Estimated cost
- $1.1M
- state registration
Permit & project history
1 projectThe construction of approx. 4,899 sq ft of main office and support areas in an existing slab on grade and concrete tilt wall panels on an existing 284,580 industrial facility. — chisholm 20 building 1
TDLR project registrationRenovation/AlterationProject Closed4,899 sq ft$1.1M est.- Project #
- TABS2024009347
- Tenant / owner
- Teabev Ch20 Bldg1 Office Finish Out
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7802 Southwest Loop
What is being built at 7802 Southwest Loop?
The TDLR registration describes a roughly 4,899-square-foot finish-out for main office and support areas inside an existing industrial facility.
Is a new industrial building being built at 7802 Southwest Loop?
The registration describes office and support-area construction inside an existing industrial facility, not a new industrial building.
When was the project at 7802 Southwest Loop filed?
The TDLR project registration was filed January 16, 2024. It is listed as project TABS2024009347.
How large is the office finish-out at Chisholm 20 Building 1?
The registration describes approximately 4,899 square feet of office and support areas within an existing 284,580-square-foot industrial facility.
How much will the 7802 Southwest Loop project cost?
The applicant's estimated cost for the project is $1.1 million.
Is the Chisholm 20 Building 1 project complete?
The TDLR listing marks the project status as closed. The record describes an office finish-out, but does not specify when construction was completed.