6710 Lockheed Ave
Dallas, TX 75209
6710 Lockheed Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 6710 Lockheed Ave, Dallas, TX 75209. The most recent, filed June 28, 2025, covers: “Install an 8-foot tall chain link fence with black privacy/wind barrier mesh material around the entire perimeter of the lot.a double 6-foot wide gates will be installed at the front of the property to allow vehicle access.fence is for security purposes on a vacant lot. total estimated linear footage is based on property boundary as shown on the attached survey.no electrical components or lighting are included in this scope”.
Compiled from City of Dallas records · updated Jun 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 28, 2025
- since Jun 28, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall an 8-foot tall chain link fence with black privacy/wind barrier mesh material around the entire perimeter of the lot.a double 6-foot wide gates will be installed at the front of the property to allow vehicle access.fence is for security purposes on a vacant lot. total estimated linear footage is based on property boundary as shown on the attached survey.no electrical components or lighting are included in this scope
Install an 8-foot tall chain link fence with black privacy/wind barrier mesh material around the entire perimeter of the lot.a double 6-foot wide gates will be installed at the front of the property to allow vehicle access.fence is for security purposes on a vacant lot. total estimated linear footage is based on property boundary as shown on the attached survey.no electrical components or lighting are included in this scope
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 6710 Lockheed Ave
What is being built at 6710 Lockheed Ave?
The latest filing (City of Dallas permit RES-ACC-25-000254, June 28, 2025) covers install an 8-foot tall chain link fence with black privacy/wind barrier mesh material around the entire perimeter of the lot.a double 6-foot wide gates will be installed at the front of the property to allow vehicle access.fence is for security purposes on a vacant lot. total estimated linear footage is based on property boundary as shown on the attached survey.no electrical components or lighting are included in this scope.
How many permits and filings does 6710 Lockheed Ave have?
1 filing across 1 project, from June 28, 2025 to June 28, 2025.
Is there other construction near 6710 Lockheed Ave?
Yes. Nearby filings include 6706 Lockheed Ave (install natural gas pipe to 2 new furnaces, Mar 17, 2026); 6711 Lockheed Ave (complete demolition excluding shared fences. hauling off debris and cleaning the lot blade clean, Aug 31, 2026); 6707 Lockheed Ave (running power for pool, Jun 9, 2025).
How do I get alerts for new permits at 6710 Lockheed Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75209- 6706 Lockheed AveMar 17, 2026Install natural gas pipe to 2 new furnaces · 6 m away
- 6711 Lockheed AveAug 31, 2026Complete demolition excluding shared fences. hauling off debris and cleaning the lot blade clean · 13 m away
- 6707 Lockheed AveJun 9, 2025Running power for pool · 14 m away
- 6730 Lockheed AveJul 9, 2025Demolish the old house to make the site ready for permitting for new single family home · 28 m away
- 6733 Lockheed AveJan 28, 2026Demolish old house and clear the lot to make ready for a new buliding/house · 33 m away
- 6707 Roper StJun 19, 2026Replace 2.5 ton complete gas system · 73 m away
- 6711 Prosper StOct 18, 2025Gas test · 83 m away
- 6707 Prosper StDec 8, 2020Install water heater · 83 m away
- 6723 Prosper StOct 5, 20268 foot privacy wooden fence around permitter of property · 85 m away
- 6733 Prosper StJun 3, 2025Remove and replace 1 full hvac system · 89 m away
- 6726 Prosper StDec 1, 2020Remove existing roof and install new roof · 99 m away
- 6632 Lockheed AveAug 4, 2026Gas test for meter release. house finalized in april, it exceeded the 60 days, now the gas provider is requiring city approval before connection · 110 m away