7716 La Risa Dr
Dallas, TX 75248
7716 La Risa Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7716 La Risa Dr, Dallas, TX 75248. The most recent, filed April 1, 2026, covers: “Gas test gas release”.
Compiled from City of Dallas records · updated Apr 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 1, 2026
- since Apr 1, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7716 La Risa Dr
What is being built at 7716 La Risa Dr?
The latest filing (City of Dallas permit RES-PLM-26-003507, April 1, 2026) covers gas test gas release.
How many permits and filings does 7716 La Risa Dr have?
1 filing across 1 project, from April 1, 2026 to April 1, 2026.
Is there other construction near 7716 La Risa Dr?
Yes. Nearby filings include 7727 La Risa Dr (remove and replace 3600 sq ft shingles and underlayment, Sep 9, 2026); 7731 La Risa Dr (gas repair and test, Nov 4, 2026); 7706 La Avenida Dr (replace gas riser by house to fix leak in system, Sep 8, 2026).
How do I get alerts for new permits at 7716 La Risa Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7727 La Risa DrSep 9, 2026Remove and replace 3600 sq ft shingles and underlayment · 23 m away
- 7731 La Risa DrNov 4, 2026Gas repair and test · 30 m away
- 7706 La Avenida DrSep 8, 2026Replace gas riser by house to fix leak in system · 99 m away
- 7726 La Avenida DrJul 22, 2025Gas test · 101 m away
- 7736 La Avenida DrMay 15, 2026Repalcing 50 gallon gas water heater + prv with expansion tank · 107 m away
- 7740 La Avenida DrSep 22, 2025Installing condenser, furnace and coil · 110 m away
- 7707 La Avenida DrJun 19, 2026Removing old shingles down to a clean deck, applying new shingles · 111 m away
- 7721 La Avenida DrJan 19, 2026Replace 4 ton base horizontal gas system · 115 m away
- 7727 La Avenida DrJun 29, 2026Replace interior hot and cold water lines with uponor pex pipe. replacing the sewer and water system with new sewer main and water main.we are running a new 3” pvc drain riser to the upstairs for a future bathroom addition. install caps.we are running a new ¾” hot and cold risers to the upstairs for a future bathroom.install caps.there is currently only 1 fixture upstairs on the addition above the garage (bar sink).1. run new ¾” pex main water line2. run new sewer main with 3” pvc3. install new 2” pvc drain for washer machine line.4. install new 2 pvc drain for kitchen sink5. install new 3” pvc and flange for toilet6. install new 2” pvc for sink’s amp; shower7. install new 2” pvc for tub8. install new 3” pvc and flange for toilet9. install new 2” pvc for sinks and tub/shower combo.10. install new 3” pvc and flange for toilet11. install new 2” pvc for sink12. connect to existing riser for upstairs bar sink drain · 118 m away
- 7731 La Avenida DrDec 5, 20257731 la avenida reset reshim 2,131 sq ft to stabilize foundation · 121 m away
- 7717 El Santo LnMay 15, 2026Replacing 50 gallon gas water heater in utility closet · 121 m away
- 7706 El Santo LnAug 10, 2026Mcr with battery joel adair- installation of 7.395 kw pv system + 20 kwh energy storage system, and smart electrical panel 40 · 130 m away