Elgin Intermediate School HVAC replacement
HVAC replacement work was registered for Elgin Intermediate School on December 20, 2024. The project description calls for replacing rooftop units and split systems and patching an exterior wall. The TDLR registration lists an estimated project cost of $3,042,000 and a status of Inspection Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 20, 2024
- since Dec 20, 2024
- Largest scope
- 48,000 sf
- Estimated cost
- $3.0M
- state registration
Permit & project history
1 projectReplace hvac rooftop units and split systems, patch exterior wall at location of demolished duct penetration. — elgin intermediate school
TDLR project registrationRenovation/AlterationInspection Complete48,000 sq ft$3.0M est.- Project #
- TABS2025008294
- Tenant / owner
- Elgin ISD 2025 Hvac Replacements - Elgin Intermediate School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8407 Treehouse Ln
What is being built at 8407 Treehouse Ln?
The TDLR project record describes HVAC replacement work at Elgin Intermediate School, not a new building. It includes rooftop units, split systems and an exterior wall patch.
Is a new school being built at Elgin Intermediate School?
The December 20, 2024 TDLR registration describes renovation and alteration work to replace HVAC equipment. It does not describe construction of a new school.
What HVAC work is planned at Elgin Intermediate School?
The project description calls for replacing rooftop HVAC units and split systems. It also includes patching an exterior wall where a duct penetration was demolished.
When was the Elgin Intermediate School HVAC project filed?
The TDLR registration was filed on December 20, 2024. Its project number is TABS2025008294.
How much will the Elgin Intermediate School HVAC project cost?
The TDLR registration lists an estimated project cost of $3,042,000. This is the applicant's estimate for the project.
Is the Elgin Intermediate School HVAC project complete?
The TDLR project record lists its status as Inspection Complete. The registration describes HVAC replacement and exterior wall patching.
Also being built nearby
All of 78749- 3910 Alexandria DrSep 12, 2024Replacement of complete existing central heat and air system with or without duct work · 61 m away
- 4000 Alexandria DrApr 24, 2025Approx 30 of building drain/sewer replacement starting at left hand side of driveway. approx 25 of concrete will be busted and repaired · 68 m away
- 4002 Alexandria DrDec 10, 2024Express: replace 2 existing windows · 77 m away
- 4008 Alexandria DrSep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 4005 Alexandria DrJan 17, 2024Replacement of an existing water heater · 128 m away
- 4012 Alexandria DrAug 28, 2026*partial demolition* addition/remodel to existing single family residence including partial demolition of a new 184 sq ft covered rear porch. work encompasses floor pan expansion electrical updates · 134 m away
- 4002 Lillian LnApr 17, 2026Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 4009 Lillian LnSep 30, 2025Replacement of an existing water heater gas tank water heater · 139 m away
- 3908 Danli LnDec 7, 2023Disconnect for solar panels replacing load center in preparation of 8.1 kw roof mounted solar system · 170 m away
- 3910 Danli LnNov 14, 2025Install new water line for home · 175 m away
- 3814 Arrow DrNov 13, 2025Express- remove and replace 4 windows: like for like no structural changes · 181 m away
- 3803 Arrow DrDec 30, 2024Replacement of complete existing central heat and air system with or without duct work · 181 m away