101 North Loop
Houston, TX 77018
Retail shell and grocery-store buildout permits at 101 North Loop
Houston permits indicate a 41,880-square-foot shell for future retail at 101 North Loop, filed April 19, 2017, followed by a 30,000-square-foot grocery-store buildout permit filed December 11, 2017. Later permits cover a 30,000-square-foot retail interior remodel in 2021 and a 280-square-foot retail remodel in 2022.
Summarized from City of Houston records · updated Dec 13, 2022
- Projects
- 5
- 5 filings
- Latest filing
- Dec 13, 2022
- since Apr 19, 2017
- Largest scope
- 41,880 sf
- Listed value
- —
Permit & project history
5 projectsSources: City of Houston
Questions about 101 North Loop
What is being built at 101 North Loop in Houston?
Permits describe a 41,880-square-foot shell for future retail and a 30,000-square-foot grocery-store buildout. The shell permit was filed April 19, 2017, and the buildout permit was filed December 11, 2017.
Is a grocery store opening at 101 North Loop?
A City of Houston permit filed December 11, 2017, describes a 30,000-square-foot grocery-store buildout. The records provided do not identify an opening date or confirm whether the store opened.
When were permits filed for retail work at 101 North Loop?
The records include a shell permit filed April 19, 2017, a grocery-store buildout permit filed December 11, 2017, a retail interior remodel permit filed February 12, 2021, and a 280-square-foot retail remodel filed December 13, 2022.
Was there demolition at 101 North Loop?
Yes. City of Houston permit 17060572, filed June 20, 2017, describes building demolition and sewer disconnection.
What retail remodels were permitted at 101 North Loop?
Permit 20106748, filed February 12, 2021, describes a 30,000-square-foot retail interior remodel. Permit 22116339, filed December 13, 2022, describes a 280-square-foot retail remodel.
What retail development is near Spartan Equity on East 31st Street?
At 101 North Loop, about 134 meters from Spartan Equity at 208 E 31st St, permits describe a retail shell and grocery-store buildout. The shell permit was filed in April 2017, and the buildout permit in December 2017.
Also being built nearby
All of 77018- 202 E 30th StApr 18, 2023Residential remodel and addition · 69 m away
- 209 E 30th StJun 6, 2019Single-family residence with attached garage · 71 m away
- 214 E 30th StJun 21, 2018Commercial minor repair per spec list · 77 m away
- 215 E 30th StJun 3, 2019Residential leveling block and base foundation · 79 m away
- 204 E 30th StJun 26, 2024Residential substantial remodel/new home · 79 m away
- 3004 Yale StOct 13, 2022New locker install in existing retail · 112 m away
- 101 North Loop StripAug 24, 2018(epr) install ev charger for existing retail · 125 m away
- 101 North Loop FpApr 19, 2017(epr) fire pump room 100% (2 of 2) · 125 m away
- 122 E 31st 1/2 StJan 18, 2024Single-family residence with attached garage / (mst of 2) · 128 m away
- 211 E 30th StJul 1, 2025Residential repair per spec list 2021 · 129 m away
- 118 E 31st 1/2 StMay 9, 2022Single-family residence-no garage / (mst of 2) · 129 m away
- 114 E 31st 1/2 StJul 20, 2021Residential (109 sq ft) addition & remodel · 132 m away