4265 Wright Rd
Houston, TX 77032
4265 Wright Rd: 4 projects on record
Texas Department of Licensing and Regulation and City of Houston list 6 filings across 4 projects at 4265 Wright Rd, Houston, TX 77032 since June 20, 2023. The most recent, filed July 14, 2025, covers: “The scope of work includes converting the existing cart storage area at the north end of the united mail sort facility into a new exit-only lane for the nv-53 checkpoint. — iah”. The state accessibility registration estimates the project at $1.0M.
Compiled from Texas Department of Licensing and Regulation, City of Houston records · updated Jul 14, 2025
- Projects
- 4
- 6 filings
- Latest filing
- Jul 14, 2025
- since Jun 20, 2023
- Largest scope
- —
- Estimated cost
- $1.0M
- state registration
Permit & project history
4 projectsThe scope of work includes converting the existing cart storage area at the north end of the united mail sort facility into a new exit-only lane for the nv-53 checkpoint. — iah
TDLR project registrationRenovation/AlterationReview Complete500 sq ft$1.0M est.- Project #
- TABS2027001294
- Owner
- Nv - 53 - Checkpoint Charlie
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Houston
Questions about 4265 Wright Rd
What is being built at 4265 Wright Rd?
The latest filing (TDLR project registration TABS2027001294, September 17, 2026) covers the scope of work includes converting the existing cart storage area at the north end of the united mail sort facility into a new exit-only lane for the nv-53 checkpoint. — iah.
How many permits and filings does 4265 Wright Rd have?
6 filings across 4 projects, from June 20, 2023 to July 14, 2025.
How much is the construction at 4265 Wright Rd worth?
The project's state registration lists an estimated cost of $1.0M.
What is being built near Iah - United in Houston?
4265 Wright Rd is about 243 m from Iah - United (3950 Terminal Rd). Its latest filing is for the scope of work includes converting the existing cart storage area at the north end of the united mail sort facility into a new exit-only lane for the nv-53 checkpoint. — iah.
Is there other construction near 4265 Wright Rd?
Yes. Nearby filings include 3950 Terminal Rd (terminal b redevelopment - processor - ssp office — renovation/alteration — demolition of interiors, finishes, ceilings of the existing cd connector departures level area 11 and the build out of offices, small meeting area and cash room with required mep systems, it/security, finishes and fire protection, Feb 19, 2024); 3950 N Terminal Rd, Houston TX 77032 (starbucks e1- millwork — renovation/alteration — project proposes to revise the front of house millwork of a recently completed starbucks location at gate e1. the existing millwork counter and base are scheduled for removal and new millwork is scheduled for install, Mar 12, 2026); 4303 Wright Rd (united in-flight training center - trailer-bsg-2021-152-iah, Aug 16, 2021).
How do I get alerts for new permits at 4265 Wright Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77032- 3950 Terminal Rd · Iah - UnitedFeb 19, 2024Terminal b redevelopment - processor - ssp office — renovation/alteration — demolition of interiors, finishes, ceilings of the existing cd connector departures level area 11 and the build out of offices, small meeting area and cash room with required mep systems, it/security, finishes and fire protection · 243 m away
- 3950 N Terminal Rd, Houston TX 77032 · Iah Terminal EMar 12, 2026Starbucks e1- millwork — renovation/alteration — project proposes to revise the front of house millwork of a recently completed starbucks location at gate e1. the existing millwork counter and base are scheduled for removal and new millwork is scheduled for install · 243 m away
- 4303 Wright RdAug 16, 2021United in-flight training center - trailer-bsg-2021-152-iah · 254 m away
- 4375 Wright RdOct 22, 2025Ua-inflight guard building installation-bsg-2025-375-iah · 302 m away
- 3870 N Terminal Rd · Iah George Bush Intercontinental AirportJun 25, 2025Starbucks — renovation/alteration — interior tenant alteration of a space within the william p. hobby international airport (hou). new finishes, partitions, millwork, food equipment, and electrical, plumbing, structural work 763sf · 325 m away
- 3870 North Terminal Road- Iah Fis · City Of Houston – Houston Airport System DivisionFeb 27, 2026British airways renovation- the monarch suite f.m201.3.7 — renovation/alteration — build out of non- structural demountable walls, install non-structural drop-down suspended drywall ceiling, adjust sprinkler head], paint, decals, counter, kitchen booth, install and raising of existing outlets · 325 m away
- 3870 North Terminal Rd · International Central ProcessorSep 23, 2025Fitout of all nippon airways ticket office — renovation/alteration — scope of work includes installation of additional outlets, infrastructure for wall hung tvs, and millwork · 325 m away
- 3870 N Terminal Rd · Terminal E - IahOct 15, 2025Eva air - interior relocation — new construction — interior construction and buildout · 325 m away
- 3870 Terminal Road · Iah Terminal EOct 20, 2025Clear check-in kiosks at iat terminal e — renovation/alteration — new clear customer kiosks and biometric gates at iah terminal e (8,276 sq ft) · 325 m away
- 3870 North Terminal Road · City Of Houston – Houston Airport System DivisionOct 29, 2026Iah terminal e - fis/cbp digital signage — renovation/alteration — 108,000 sq ft, digital signage being added to select columns and ceiling locations · 325 m away
- 3850 N TerminalNov 15, 2018United airlines pc air and gpu replacement/terminal e (i-18-138t) · 345 m away
- 4370 Wright RdJun 20, 2023United inflight employee parking lot mods - bsg-2023-163-iah · 346 m away