1600 Brown
Hurst, TX 76054 · City Of Hurst
Brown Trail five-lane roadway reconstruction
A roadway reconstruction project on Brown Trail is planned, including work on a five-lane roadway, driveways, sidewalks and curb ramps. The project was registered with TDLR on December 10, 2025; the applicant estimated its cost at $341,010.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- 60,000 sf
- Estimated cost
- $341K
- state registration
Permit & project history
1 projectRoadway reconstruction of a 5 lane roadway including driveways, sidewalks, curb ramps and rrpb. — brown trail
TDLR project registrationRenovation/AlterationReview Complete60,000 sq ft$341K est.- Project #
- TABS2026007668
- Tenant / owner
- Brown Trail Reconstruction
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1600 Brown
What is being built at 1600 Brown in Hurst?
A TDLR project registration describes roadway reconstruction on Brown Trail, including driveways, sidewalks and curb ramps. The registration is for Brown Trail Reconstruction, project TABS2026007668.
When was the Brown Trail reconstruction filed?
The TDLR registration was filed December 10, 2025. Its status is listed as Review Complete.
What work is planned for Brown Trail?
The project description calls for reconstruction of a five-lane roadway, including driveways, sidewalks and curb ramps.
How much will the Brown Trail project cost?
The applicant estimated the project cost at $341,010 in the TDLR registration. This is an estimate, not a reported final cost.
What roadway work is planned near El Tapatio on Brown Trail?
The Brown Trail Reconstruction registration describes work on a five-lane roadway, with driveways, sidewalks and curb ramps. El Tapatio is listed about 515 meters from the project address.
Also being built nearby
All of 76054- 1601 Brown Trail · Hurst-Euless-Bedford Independent School District (heb Isd)Oct 4, 2024L.d. bell high school replacement — new construction — this project is the demolition of the existing ld bell high school and new construction of a new ld bell high school. the new high school is on the same site and will be built in two phases. phase 2 will be the demolition of the existing high school · 13 m away