1501 E Lyon St
Laredo, TX 78040 · The City Of Laredo
Proposed walking trail and wall at Lyon Street booster station
A proposed 10-foot concrete walking trail, landscaping stone, and south property wall are planned at the Lyon Street booster station in Laredo. The project was registered with the Texas Department of Licensing and Regulation on February 16, 2026; an architectural water feature is listed only if the city chooses to construct it.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 16, 2026
- since Feb 16, 2026
- Largest scope
- 19,030 sf
- Estimated cost
- $90K
- state registration
Permit & project history
1 project10' concrete walking trail (4" thickness), landscaping stone along walking trail to prevent erosion. see sheet c3. water architectural water feature (if city chooses construct). see sheet c3 — lyon st booster station (south of booster station on seymour ave side)
TDLR project registrationNew ConstructionProject Registered19,030 sq ft$90K est.- Project #
- TABS2026012680
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1501 E Lyon St
What is being built at 1501 E Lyon St in Laredo?
A TDLR project registration describes a proposed 10-foot concrete walking trail, landscaping stone to help prevent erosion, and a south property wall at the Lyon Street booster station. It also lists an architectural water feature if the city chooses to construct it.
When was the Lyon Street booster station project registered?
The project was registered with the Texas Department of Licensing and Regulation on February 16, 2026. Its registration number is TABS2026012680.
Is a water feature planned at 1501 E Lyon St?
The registration includes an architectural water feature, but says it will be constructed only if the city chooses to proceed with it.
How long is the proposed walking trail at the Lyon Street booster station?
The registration describes a 10-foot-wide concrete trail with a listed project area of 19,030 square feet.
How much is the Lyon Street booster station project estimated to cost?
The TDLR registration lists an estimated cost of $90,000. This is the applicant's estimate for the project.