What's being built in Taylor
Every permit and project filing in Taylor, indexed by address. Search a street, or browse by ZIP code and project type.
- Addresses tracked
- 28
- Active in last 12 months
- 26
- ZIP codes
- 1
Notable commercial projects
- 201 FM 3349 · Tesla RailheadOct 5, 2026Tesla railhead — new construction — installation of hss steel and hdme mesh carport (hail canopy) structures over the vehicle lot, 229,040 sq ft · 76574
- 11533 US Hwy · Rm Business LLC (prop Convenience Store)Sep 29, 2026Rm business llc (prop convenience store) — new construction — 5,000 square foot convenience store plus gas station · 76574
- 100 Gradiant Street · Gradiant Technology Park Phase 1Sep 21, 2026Gradiant technology park phase 1 — new construction — public sidewalk, public trail (7,449 square yards) · 76574
Just filed
- 506 Porter St · Taylor Tea HouseOct 9, 2026Taylor tea house — additions to existing building — new addition of a kitchen on the back of the addition · 76574
- 201 FM 3349 · Tesla RailheadOct 5, 2026Tesla railhead — new construction — installation of hss steel and hdme mesh carport (hail canopy) structures over the vehicle lot, 229,040 sq ft · 76574
- 11533 US Hwy · Rm Business LLC (prop Convenience Store)Sep 29, 2026Rm business llc (prop convenience store) — new construction — 5,000 square foot convenience store plus gas station · 76574
- 100 Gradiant Street · Gradiant Technology Park Phase 1Sep 21, 2026Gradiant technology park phase 1 — new construction — public sidewalk, public trail (7,449 square yards) · 76574
- 14150 U.s. Highway 79 · Nyle Maxwell Chrysler Dodge Ram + JeepSep 16, 2026Nyle maxwell chrysler dodge ram + jeep — new construction — the proposed project requires the construction of a new 100% fully fire sprinklered two story automobile sales facility with attached sprinklered service shop · 76574
- 311c East 7th St · Mary Olson Apartments RadSep 15, 2026Mary olson apartments rad — renovation/alteration — interior renovations of bathrooms, closets, and the community room renovation. addition of new administrators' office, front entry, and accessible entry · 76574
- 1908 Old Granger Road · 1908 Old Granger Road BbqAug 28, 20261908 old granger road bbq — new construction — new building to house restaurant. work consists of erecting a metal building with an enclosed pit area, built-in cooler, conditioned dining seating area, commercial kitchen and restrooms. also, exterior , landscaping and site work · 76574
- 103 Carlos G Parker Blvd NW · 06344 Chick-Fil-A Ground Up RestaurantAug 27, 202606344 chick-fil-a ground up restaurant — new construction — build a ground up chick-fil-a restaurant · 76574
- 2101 N Main StAug 19, 20267 brew taylor, tx — new construction — new construction - drive-thru coffee stand - 510 sq ft · 76574
- 140 Logistics Loop EastAug 12, 2026T-project — new construction — new factory with asmepc disciplines · 76574
- 215 N. Main Street · Adaptive Reuse ProjectJul 31, 2026Adaptive reuse project — renovation/alteration — renovation of existing building. work consists of minor demolition, adding new restrooms, kitchen and bar. also, updating electrical, plumbing, hvac, flooring and adding rear exterior landing · 76574
- 11001 S State Hwy · Coupland IndustrialJul 9, 2026Coupland industrial — new construction — (2) 8000 gsf pre-engineered metal buildings for light metal fabrication and storage. around 1400 gsf of office and business space inside the shell buildings · 76574
- 107 N Main Street · 107 N Main StreetJun 22, 2026107 n main street — renovation/alteration — adaptive reuse of existing building.proposed work includes the following: repoint and repair existing masonry to remain; add new windows, and storefronts, downspouts, exterior lighting including sconces, awning led and security, clean/repair parapet · 76574
- 201 Mustang Cove · Ringer Windows Interior Finish OutJun 15, 2026Ringer windows interior finish out — renovation/alteration — interior finish out in an existing shell building · 76574
- 110 W. 1st Street · 110 W 1st Street Adaptive ReuseJun 10, 2026110 w 1st street adaptive reuse — renovation/alteration — daptive reuse of 4,825 sq ft building. work includes replacing front, rear and partial side masonry walls with brick veneer, insulation, electrical, lighting gyp,. board walls & ceiling, new roof on steel structure · 76574