groundranger
Historic · latest filing Mar 2024Commercial

10 Boiling Drive

Waco, TX 76705 · Texas State Technical College

129,120-square-foot vocational training facility planned for Waco

A 129,120-square-foot higher education facility for vocational training is planned at 10 Boiling Drive for Texas State Technical College. The TDLR project registration was filed March 29, 2024, and lists the project as new construction. The applicant estimated the project cost at $60 million.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 29, 2024

Projects
1
1 filings
Latest filing
Mar 29, 2024
since Mar 29, 2024
Largest scope
129,120 sf
Estimated cost
$60M
state registration

Permit & project history

1 project
  1. TSTC Waco Campus CCAP

    129,120 sq ft higher educational facility for vocational training. — texas state technical college

    TDLR project registrationNew ConstructionProject Closed129,120 sq ft$60M est.
    Tenant / owner
    Tstc Waco Campus Ccap
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 10 Boiling Drive

What is being built at 10 Boiling Drive in Waco?

A 129,120-square-foot higher education facility for vocational training is planned for Texas State Technical College. The TDLR registration, filed March 29, 2024, identifies it as new construction.

What is the TSTC Waco Campus CCAP project?

It is a registered new-construction project for a vocational training facility at 10 Boiling Drive. The project registration number is TABS2024014989.

How large will the facility at 10 Boiling Drive be?

The TDLR registration describes a 129,120-square-foot facility for higher education and vocational training.

Who is associated with the project at 10 Boiling Drive?

The project record names Texas State Technical College and identifies the project as TSTC Waco Campus CCAP.

When was the TSTC Waco Campus CCAP project registered?

The TDLR project registration was filed March 29, 2024.

What is the estimated cost of the TSTC Waco facility?

The project applicant estimated the cost at $60 million in the TDLR registration. This is an estimate, not a confirmed final project cost.

Is the TSTC Waco Campus CCAP project complete?

The TDLR record lists the project status as “Project Closed.” It does not provide a construction completion date.

Get alerts for 10 Boiling Drive