555 TX 340 Loop
Waco, TX 76705 · La Vega High School Auditorium Remodel, La Vega High School Additions And Renovations/Press Box + 1 more
Multi-tenant site has auditorium and press box projects
TDLR records list an 8,300-square-foot La Vega High School auditorium remodel and a 7,400-square-foot press box facility at this multi-tenant site. The press box project was registered on September 9, 2025, and the auditorium remodel was registered on January 19, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 19, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 19, 2026
- since May 9, 2025
- Largest scope
- 67,000 sf
- Estimated cost
- $37M
- state registration
Permit & project history
3 projectsInterior renovations to existing high school auditorium. the approx area of work emcompasses 8,300sf. the renovations include a new control booth, new wall, ceiling, floor treatments, upgrades to existing audio, video, lighting systems & new seating — la vega high school
TDLR project registrationRenovation/AlterationReview Complete8,300 sq ft$2.4M est.- Project #
- TABS2026010352
- Tenant / owner
- La Vega High School Auditorium Remodel
- Design firm
- Pro
- Contact
- Pro
This new 7400 sq ft facility will include a new restroom facilities for the home side grand stand, an elevator and viewing suites. the site work for this protion of work includes a new plaza directly adjacent to the new press box — la vega pressbox
TDLR project registrationRenovation/AlterationReview Complete7,400 sq ft$7.3M est.- Project #
- TABS2026000488
- Tenant / owner
- La Vega High School Additions And Renovations/Press Box
- Design firm
- Pro
- Contact
- Pro
A new 2-story, 67,000 sq ft cte facility housing nursing, welding and culinary programs as well as some general purpose classrooms. the welding lab and lockers rooms are a storm shelter serving the student population — la vega early college high school
TDLR project registrationNew ConstructionReview Complete67,000 sq ft$37M est.- Project #
- TABS2025018663
- Tenant / owner
- La Vega Echs /Cte & P-Tech
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 555 TX 340 Loop
What is being built at 555 TX 340 Loop in Waco?
TDLR records list a new press box facility and renovations to an existing high school auditorium at the multi-tenant site. The press box registration describes restrooms, an elevator, viewing suites and an adjacent plaza.
Is the auditorium at 555 TX 340 Loop being renovated?
Yes. A TDLR registration filed January 19, 2026, describes interior renovations to about 8,300 square feet, including seating and upgrades to audio, video and lighting systems. The project number is TABS2026010352.
What is included in the La Vega High School press box project?
The 7,400-square-foot facility is registered to include home-side grandstand restrooms, an elevator and viewing suites, with a new plaza beside the press box. The registration was filed September 9, 2025, as TABS2026000488.
When were the projects at 555 TX 340 Loop filed?
The press box project was filed September 9, 2025. The auditorium remodel was filed January 19, 2026.
How large are the projects at 555 TX 340 Loop?
The auditorium remodel covers about 8,300 square feet, and the press box facility is listed at 7,400 square feet in TDLR records.
What is the estimated cost of the work at 555 TX 340 Loop?
TDLR records list an estimated project cost of $7.3 million. This is an estimate, not a confirmed final cost.