310 E 5th St
Austin, TX 78701
Hotel lobby, restaurant and meeting-room remodel at 310 E 5th
A phased remodel of the hotel’s first floor covers the lobby, a restaurant and meeting rooms. Building permits were filed March 20, 2025, followed by plumbing permits May 8 and electrical permits May 13; sign permits for Skipjack were filed September 9.
Summarized from City of Austin records · updated Sep 9, 2025
- Projects
- 13
- 13 filings
- Latest filing
- Sep 9, 2025
- since Jul 18, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
13 projectsSkipjack sign c blade sign
Skipjack sign c blade sign
City of Austin permitElectrical PermitFinal- Record
- 2025-105576 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Skipjack exterior wall sign on west facade
Skipjack exterior wall sign on west facade
City of Austin permitElectrical PermitFinal- Record
- 2025-102013 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Skipjack sign b routed aluminum backer
Skipjack sign b routed aluminum backer
City of Austin permitElectrical PermitFinal- Record
- 2025-105567 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - restaurant in 1st floor phase 3
Remodel hotel - restaurant in 1st floor phase 3
City of Austin permitElectrical PermitFinal- Record
- 2025-032384 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - includes lobby restaurant and meeting rooms in 1st floor phase 2
Remodel hotel - includes lobby restaurant and meeting rooms in 1st floor phase 2
City of Austin permitElectrical PermitFinal- Record
- 2025-032383 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - lobby in 1st floor phase 1
Remodel hotel - lobby in 1st floor phase 1
City of Austin permitElectrical PermitFinal- Record
- 2025-032382 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - lobby in 1st floor phase 1
Remodel hotel - lobby in 1st floor phase 1
City of Austin permitPlumbing PermitFinal- Record
- 2025-032382 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - includes lobby restaurant and meeting rooms in 1st floor phase 2
Remodel hotel - includes lobby restaurant and meeting rooms in 1st floor phase 2
City of Austin permitPlumbing PermitFinal- Record
- 2025-032383 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - restaurant in 1st floor phase 3
Remodel hotel - restaurant in 1st floor phase 3
City of Austin permitPlumbing PermitFinal- Record
- 2025-032384 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - restaurant in 1st floor phase 3
Remodel hotel - restaurant in 1st floor phase 3
City of Austin permitBuilding PermitFinal- Record
- 2025-032384 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - includes lobby restaurant and meeting rooms in 1st floor phase 2
Remodel hotel - includes lobby restaurant and meeting rooms in 1st floor phase 2
City of Austin permitBuilding PermitFinal- Record
- 2025-032383 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel hotel - lobby in 1st floor phase 1
Remodel hotel - lobby in 1st floor phase 1
City of Austin permitBuilding PermitFinal- Record
- 2025-032382 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
This permit will be for removing and replacing fixtures in the guestrooms and corridors above the 1st floor. nothing else will be done but the fixtures. there is a permit review for another project at the same address but this for the public space on the 1st floor and is completely separate from the fixture replacement on the upper floors
This permit will be for removing and replacing fixtures in the guestrooms and corridors above the 1st floor. nothing else will be done but the fixtures. there is a permit review for another project at the same address but this for the public space on the 1st floor and is completely separate from the fixture replacement on the upper floors
City of Austin permitElectrical PermitFinal- Record
- 2024-089156 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 310 E 5th St
What is being built at 310 E 5th St in Austin?
City permits describe a phased first-floor hotel remodel covering the lobby, restaurant and meeting rooms. Building permits were filed March 20, 2025.
Is the hotel at 310 E 5th being remodeled?
Yes. Permits cover work on the first-floor lobby, restaurant and meeting rooms, with plumbing permits filed May 8, 2025, and electrical permits filed May 13.
What restaurant work is permitted at 310 E 5th St?
The permit descriptions include a first-floor hotel restaurant remodel in phase 3 and a lobby, restaurant and meeting-room remodel in phase 2. Building permit 2025-032384 BP was filed March 20, 2025.
What are the Skipjack permits at 310 E 5th for?
Three electrical permits filed September 9, 2025, describe Skipjack signs: a blade sign, an exterior wall sign on the west facade and a routed aluminum backer.
What is being remodeled near Mercer Restaurant in downtown Austin?
At 310 E 5th St, about 53 meters from Mercer Restaurant at 500 San Jacinto Boulevard, permits describe a phased hotel first-floor remodel with a lobby, restaurant and meeting rooms.
Also being built nearby
All of 78701- 318 E 5th StFeb 28, 20252025/03/07 and 2025/03/08 (#sxsw) - vtprodesign will be producing a two-day experiential walkthrough at 318 east 5th st. the activation is anticipated to hold no more than 25 guests at a time for an approximately 10 minute experience. there will be no live music/performances or talking-heads/speakers. the experience is a walkthrough visual and environmental engagement based off of an upcoming tv series. activation dates: load-in: 8:00am-11:59pm march 3rd - 6th 2025 live: 11:00am-10:00pm march 7th-8th 2025 load-out: 10:00pm-11:59pm march 8th-10th 2025 · 23 m away
- 310 East Fifth Street · Wesaus, LLCApr 8, 2024Public space renovation — renovation/alteration — dining area renovation including finishes, seating, lighting, oyster bar and private dining area · 32 m away
- 504 Trinity StSep 30, 2025Replace damaged service disconnect per ec: replacing the meter can if needs to be updated and disconnect that is damaged · 46 m away
- 305 E 5th StJun 26, 2024Install a new riser backflow preventer and cutover and replace 8-10 ft of fireline pipe tied to the existing fire suppression system · 47 m away
- 506 San Jacinto BlvdOct 7, 2025Replacing 15 existing ev chargers with new city of austin approved chargers like for like swap out no new addt loads allowed no new car chargers to be installed · 52 m away
- 500 San Jacinto Boulevard · 5th And Brazos Property Owner LLCOct 30, 2026Mercer restaurant — renovation/alteration — interior remodel of 4,269 sq ft existing restaurant into new restaurant · 53 m away
- 311 E 5th StAug 10, 2026Finish out for outdoor amenity space (pool to be permitted separately) includes outdoor lounge and pool deck floor 14 · 58 m away
- 301 E 6th StJan 18, 2024Secondary mechanical permit install (2) walk-in coolers and refrigeration reference: 2022-159450 mp · 73 m away
- 500 San Jacinto BlvdMar 2, 2007Ncnb drive through bank · 82 m away
- 509-1/2 Trinity StOct 4, 2024Block 59 alley and neches duct bank · 83 m away
- 401 E 5th StJun 3, 2026Replace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp · 84 m away
- 219 E 6th StOct 5, 2026Rebuild existing service. install trans-socket meter 400 amps install new fuse disconnect · 99 m away