401 E 5th St
Austin, TX 78701
Generator equipment replacement at an existing EMS/fire station
Permits at 401 E 5th St cover replacing an existing natural-gas generator transfer-switch docking station on its equipment pad and changing out a service-disconnect fuse. The building permit, 2025-112487 BP, was filed Sept. 5, 2025, and is active. Related electrical and plumbing permits were filed May 5 and June 3, 2026, and are final.
Summarized from City of Austin records · updated Jun 3, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Jun 3, 2026
- since Jul 1, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsReplace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp
Replace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp
City of Austin permitPlumbing PermitFinal- Record
- 2025-112487 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp
Replace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp
City of Austin permitElectrical PermitFinal- Record
- 2025-112487 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp
Replace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp
City of Austin permitBuilding PermitActive- Record
- 2025-112487 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of single irrigation zone at coa fire station #1 remodel project
Installation of single irrigation zone at coa fire station #1 remodel project
City of Austin permitPlumbing PermitFinal- Record
- 2024-081294 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Extensive renovation of this 1938 fire station to largely maintain the apparatus room (garage) while largely reconfiguring the balance of the interior to convert the dormitory into individual sleeping rooms with new kitchens day rooms study rooms offices and workout room. a two-story addition adds an additional exit stair elevator and entry lobby creating a new main accessible public entry. at the second floor the addition extends over the existing roof to expand the kitchen and dining areas. the roof immediately adjacent this addition will be re-roofed and will include an exterior terrace improvement.the work also includes all new mechanical electrical and plumbing including a new electrical service. the existing windows are being replaced with thermal windows
Extensive renovation of this 1938 fire station to largely maintain the apparatus room (garage) while largely reconfiguring the balance of the interior to convert the dormitory into individual sleeping rooms with new kitchens day rooms study rooms offices and workout room. a two-story addition adds an additional exit stair elevator and entry lobby creating a new main accessible public entry. at the second floor the addition extends over the existing roof to expand the kitchen and dining areas. the roof immediately adjacent this addition will be re-roofed and will include an exterior terrace improvement.the work also includes all new mechanical electrical and plumbing including a new electrical service. the existing windows are being replaced with thermal windows
City of Austin permitMechanical PermitFinal- Record
- 2023-030883 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of a new 6-inch fire line approximately 195 lf tie-in to existing 8-inch waterline main. installation of new 2.5-inch water line approximately 150 lf & installation of new 4-inch wastewater line approximately 125 lf tie-in to existing wwl. reference: 2023-030883 bp sp-2020-0418d
Installation of a new 6-inch fire line approximately 195 lf tie-in to existing 8-inch waterline main. installation of new 2.5-inch water line approximately 150 lf & installation of new 4-inch wastewater line approximately 125 lf tie-in to existing wwl. reference: 2023-030883 bp sp-2020-0418d
City of Austin permitPlumbing PermitFinal- Record
- 2023-005386 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Temp stair system
Temp stair system
City of Austin permitBuilding PermitFinal- Record
- 2023-089244 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 401 E 5th St
What is being built at 401 E 5th St?
The permits describe equipment replacement at an existing EMS/fire station: a natural-gas generator transfer-switch docking station and a service-disconnect fuse. They do not describe a new building.
What do the permits at 401 E 5th St cover?
They cover replacing the existing generator transfer-switch docking station on its equipment pad and changing out a service-disconnect fuse. The work is described in building permit 2025-112487 BP and related electrical and plumbing permits.
When were permits filed for work at 401 E 5th St?
The building permit was filed Sept. 5, 2025. The electrical permit was filed May 5, 2026, and the plumbing permit was filed June 3, 2026.
Is a new building going up at 401 E 5th St?
The permit descriptions indicate equipment replacement at an existing EMS/fire station, not construction of a new building. The building permit remains active; the electrical and plumbing permits are final.
What work is happening near Mercer Restaurant on San Jacinto Boulevard?
At 401 E 5th St, about 129 meters from Mercer Restaurant at 500 San Jacinto Boulevard, permits describe replacement of generator equipment and a service-disconnect fuse at an existing EMS/fire station.
Also being built nearby
All of 78701- 311 E 5th StAug 10, 2026Finish out for outdoor amenity space (pool to be permitted separately) includes outdoor lounge and pool deck floor 14 · 43 m away
- 504 Trinity StSep 30, 2025Replace damaged service disconnect per ec: replacing the meter can if needs to be updated and disconnect that is damaged · 50 m away
- 409 E 5th StNov 24, 2025Installation of a permanent art in public places (aipp) public art sculpture in brush square park by artist george sabra. minimal ground disturbance no utility tie ins · 55 m away
- 411 E 5th StApr 26, 2024Emergency replacement of damaged a.e. meter socket conduit damage and service conductors at susanne dickinson museum 411 e 5th street · 75 m away
- 509-1/2 Trinity StOct 4, 2024Block 59 alley and neches duct bank · 75 m away
- 305 E 5th StJun 26, 2024Install a new riser backflow preventer and cutover and replace 8-10 ft of fireline pipe tied to the existing fire suppression system · 77 m away
- 318 E 5th StFeb 28, 20252025/03/07 and 2025/03/08 (#sxsw) - vtprodesign will be producing a two-day experiential walkthrough at 318 east 5th st. the activation is anticipated to hold no more than 25 guests at a time for an approximately 10 minute experience. there will be no live music/performances or talking-heads/speakers. the experience is a walkthrough visual and environmental engagement based off of an upcoming tv series. activation dates: load-in: 8:00am-11:59pm march 3rd - 6th 2025 live: 11:00am-10:00pm march 7th-8th 2025 load-out: 10:00pm-11:59pm march 8th-10th 2025 · 82 m away
- 310 E 5th StSep 9, 2025Skipjack exterior wall sign on west facade · 84 m away
- 402 Neches StFeb 8, 20242024/03/08-#sxsw24official will host its lounge open to official speakers filmmakers and musicians at brush square park. tent erected on an existing platform · 105 m away
- 310 East Fifth Street · Wesaus, LLCApr 8, 2024Public space renovation — renovation/alteration — dining area renovation including finishes, seating, lighting, oyster bar and private dining area · 107 m away
- 415 E 6th StFeb 24, 2025Change of use to retail. no interior and exterior work is needed · 110 m away
- 501 Neches StOct 11, 2024Change of use to cocktail lounge and food sales (dispensary) for paint move in furniture and appliances · 120 m away