405 E 7th St
Austin, TX 78701
405 E 7th St: 1 project on record
City of Austin lists 1 filing across 1 project at 405 E 7th St, Austin, TX 78701. The most recent, filed February 12, 2025, covers: “2025 sxsw music event with 12x12x18 stage and 9-12 occupants”.
Compiled from City of Austin records · updated Feb 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 12, 2025
- since Feb 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project2025 sxsw music event with 12x12x18 stage and 9-12 occupants
2025 sxsw music event with 12x12x18 stage and 9-12 occupants
City of Austin permitBuilding PermitFinal- Record
- 2025-017319 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 405 E 7th St
What is being built at 405 E 7th St?
The latest filing (City of Austin permit 2025-017319 BP, February 12, 2025) covers 2025 sxsw music event with 12x12x18 stage and 9-12 occupants.
How many permits and filings does 405 E 7th St have?
1 filing across 1 project, from February 12, 2025 to February 12, 2025.
What is being built near Srpf B/Pecan Street II in Austin?
405 E 7th St is about 95 m from Srpf B/Pecan Street II (500 E 6th St). Its latest filing is for 2025 sxsw music event with 12x12x18 stage and 9-12 occupants.
Is there other construction near 405 E 7th St?
Yes. Nearby filings include 407 E 7th St (cap off water/wastewater, Jan 27, 2025); 408 E 6th St (electrical repair on existing service 200 amp disconnects were replaced, Jun 3, 2025); 412 E 6th St (emergency leak repair / replacement- tx gas is relocating the side walk curb meter to the right side of the building due to a leak at their connection and remove any trip hazards that are in place. the building is currently using gas for the rtu heater and water heater. the line run is about 150 to relocate over the roof top of the building, Jan 22, 2026).
How do I get alerts for new permits at 405 E 7th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78701- 407 E 7th StJan 27, 2025Cap off water/wastewater · 19 m away
- 408 E 6th StJun 3, 2025Electrical repair on existing service 200 amp disconnects were replaced · 45 m away
- 412 E 6th StJan 22, 2026Emergency leak repair / replacement- tx gas is relocating the side walk curb meter to the right side of the building due to a leak at their connection and remove any trip hazards that are in place. the building is currently using gas for the rtu heater and water heater. the line run is about 150 to relocate over the roof top of the building · 47 m away
- 701 Trinity StApr 12, 2022Block 87 (with r sp-2019-0480c) · 61 m away
- 422 E 6th StJun 25, 2025The electrical service for this address got a need to repair order from ae. we will be completely replacing the meter ct cabinet and disconnects with a new transocket meter and a 400 amp main panel · 65 m away
- 320 E 6th StJul 20, 2026Replacement of complete existing central heat and air system with or without duct work change the equipment inside and outside only · 86 m away
- 609-1/2 Neches StOct 29, 2026500 & 520 e 6th street ae improvements · 91 m away
- 500 E 6th St · Srpf B/Pecan Street II LPOct 7, 2026Old sixth - demolition of non historic rear addition - plumbing upgrades for shell building stubbed and capped pipes. concurrent review requested · 95 m away
- 500 E 7th StMar 14, 2024Replacement of 2.5 split system · 105 m away
- 415 E 6th StFeb 24, 2025Change of use to retail. no interior and exterior work is needed · 111 m away
- 508 E 6th StMar 18, 20262026/03/12 - 2026/03/18 | daytime panels and nighttime music showcases. official sxsw event #sxswproduced · 114 m away
- 514 E 6th Street · Srpf B/Pecan Street Ii, LPApr 28, 2025Old sixth - 514 — renovation/alteration — scope of work: minor exterior renovation, replacing wood storefront, replacing second story windows, repairing brick as needed · 115 m away