701 Trinity St
Austin, TX 78701
701 Trinity St: 4 projects on record
City of Austin lists 4 filings across 4 projects at 701 Trinity St, Austin, TX 78701 since July 25, 2018. The most recent, filed April 12, 2022, covers: “Block 87 (with r sp-2019-0480c)”.
Compiled from City of Austin records · updated Apr 12, 2022
- Projects
- 4
- 4 filings
- Latest filing
- Apr 12, 2022
- since Jul 25, 2018
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 701 Trinity St
What is being built at 701 Trinity St?
The latest filing (City of Austin case 12884836, April 12, 2022) covers block 87 (with r sp-2019-0480c).
How many permits and filings does 701 Trinity St have?
4 filings across 4 projects, from July 25, 2018 to April 12, 2022.
What is being built near Srpf B/Pecan Street II in Austin?
701 Trinity St is about 149 m from Srpf B/Pecan Street II (500 E 6th St). Its latest filing is for block 87 (with r sp-2019-0480c).
Is there other construction near 701 Trinity St?
Yes. Nearby filings include 405 E 7th St (2025 sxsw music event with 12x12x18 stage and 9-12 occupants, Feb 12, 2025); 407 E 7th St (cap off water/wastewater, Jan 27, 2025); 710 Trinity St (t-mobile replacement project-reposition and replace antennas radios and cabinets, May 29, 2024).
How do I get alerts for new permits at 701 Trinity St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78701- 405 E 7th StFeb 12, 20252025 sxsw music event with 12x12x18 stage and 9-12 occupants · 61 m away
- 407 E 7th StJan 27, 2025Cap off water/wastewater · 68 m away
- 710 Trinity StMay 29, 2024T-mobile replacement project-reposition and replace antennas radios and cabinets · 69 m away
- 408 E 6th StJun 3, 2025Electrical repair on existing service 200 amp disconnects were replaced · 105 m away
- 500 E 7th StMar 14, 2024Replacement of 2.5 split system · 107 m away
- 412 E 6th StJan 22, 2026Emergency leak repair / replacement- tx gas is relocating the side walk curb meter to the right side of the building due to a leak at their connection and remove any trip hazards that are in place. the building is currently using gas for the rtu heater and water heater. the line run is about 150 to relocate over the roof top of the building · 108 m away
- 320 E 6th StJul 20, 2026Replacement of complete existing central heat and air system with or without duct work change the equipment inside and outside only · 114 m away
- 501 E 8th StMay 23, 2024Theres already plug connection for the tankless. switching out tank water heater and switching with tankless · 122 m away
- 422 E 6th StJun 25, 2025The electrical service for this address got a need to repair order from ae. we will be completely replacing the meter ct cabinet and disconnects with a new transocket meter and a 400 amp main panel · 123 m away
- 609-1/2 Neches StOct 29, 2026500 & 520 e 6th street ae improvements · 138 m away
- 500 E 6th St · Srpf B/Pecan Street II LPOct 7, 2026Old sixth - demolition of non historic rear addition - plumbing upgrades for shell building stubbed and capped pipes. concurrent review requested · 149 m away
- 811 Trinity StJun 11, 2008First baptist church ministry center · 157 m away