509 E 5th St
Austin, TX 78701
Packaged unit replacements permitted at 509 E 5th St
A City of Austin mechanical permit filed Dec. 9, 2025, covers replacement of self-contained packaged units at 509 E 5th St. The permit description references Hilton Austin / The 555 and is listed as active.
Summarized from City of Austin records · updated Dec 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 9, 2025
- since Dec 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of any self-contained packaged units hilton austin / the 555
Replacement of any self-contained packaged units hilton austin / the 555
City of Austin permitMechanical PermitActive- Record
- 2025-155535 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 509 E 5th St
What work is planned at 509 E 5th St in Austin?
A mechanical permit covers replacement of self-contained packaged units. The permit description references Hilton Austin / The 555.
When was the permit filed for work at 509 E 5th St?
The City of Austin filed permit 2025-155535 MP on Dec. 9, 2025.
Is 509 E 5th St a new building project?
The record is for a mechanical permit to replace packaged units, not a new building permit.
What is the permit number for the work at 509 E 5th St?
The permit number is 2025-155535 MP. It is listed as active.
What is being worked on near Taqueria De Diez on E 5th Street?
At 509 E 5th St, a City of Austin permit covers replacement of self-contained packaged units. The permit was filed Dec. 9, 2025.
Is Hilton Austin mentioned in the 509 E 5th St permit?
Yes. The permit description references Hilton Austin / The 555 and covers replacement of self-contained packaged units.
Also being built nearby
All of 78701- 555 E 5th StMay 19, 2026Replacement of complete existing central heat and air system with or without duct work chilled water air handler with electric heat · 22 m away
- 506 E 5th StMar 4, 20252025/03/07 thru 2025/03/09 -(#sxsw) sxsw guests and ga attendees will be welcomed to join the activation experience to learn more about the new loreal airlight pro tool through self discovery and through brand guidance. fun photomoments for guests ugc (user generated content) will be filtered throughout with educational moments of the product. an opportunity to meet brand pro stylists for a quick product demolition will also be available. we will be activating at sxsw as a popup experience. this activation entails product r&d touchpoints product demonstrations with brand representatives and fun ugc photomoments for all guests attending · 51 m away
- 501 Neches StOct 11, 2024Change of use to cocktail lounge and food sales (dispensary) for paint move in furniture and appliances · 62 m away
- 601 E 5th StOct 9, 2024Add ups (uninterruptible power source) for existing mdf room loads along with mini-split a/c units for cooling in garage building · 71 m away
- 500 E 4th StDec 16, 2024Upgrading the fire pump and the fire pump control panel · 83 m away
- 411 E 5th StApr 26, 2024Emergency replacement of damaged a.e. meter socket conduit damage and service conductors at susanne dickinson museum 411 e 5th street · 90 m away
- 401 Neches StMar 2, 2007Convention center headquarters hilton hotel · 95 m away
- 517 E 6th StSep 20, 2024Fixing leak on gas line located in kitchen · 96 m away
- 513 E 6th StFeb 5, 2025Upgrade to existing service and replace meter due to damages · 98 m away
- 602 E 4th St · Acc Austin OfficeApr 10, 2025Project control acc austin office renovation — renovation/alteration — renovation of existing retail space to transition to office. include open office, large conference room, small conference room, and two phone rooms; existing restrooms, break room, and storage room to remain · 99 m away
- 511 E 6th StOct 28, 2025**pipe replacement on water main from meter to the building · 99 m away
- 525 E 6th StFeb 13, 20252025 sxsw music event with a 12x12x1 stage for 9-12 occupants · 100 m away