500 E 4th St
Austin, TX 78701
Fire-pump upgrades, re-roofing and interior demolition
City of Austin permits at 500 E 4th St cover interior non-structural demolition, a re-roof, and upgrades to the fire pump and its control panel. The latest permits were filed December 16, 2024, for the fire-pump work.
Summarized from City of Austin records · updated Dec 16, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Dec 16, 2024
- since Nov 29, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsUpgrading the fire pump and the fire pump control panel
Upgrading the fire pump and the fire pump control panel
City of Austin permitElectrical PermitFinal- Record
- 2024-152908 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrading the fire pump and the fire pump control panel
Upgrading the fire pump and the fire pump control panel
City of Austin permitBuilding PermitExpired- Record
- 2024-152908 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Re-roof
Re-roof
City of Austin permitBuilding PermitExpired- Record
- 2024-025160 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior non-structural demolition
Interior non-structural demolition
City of Austin permitBuilding PermitFinal- Record
- 2012-125779 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 500 E 4th St
What is happening at 500 E 4th St in Austin?
City permits list interior non-structural demolition, a re-roof, and upgrades to the fire pump and control panel. The latest filing was December 16, 2024.
Is a new building being constructed at 500 E 4th St?
The listed permits describe interior demolition, re-roofing, and fire-pump upgrades; they do not describe construction of a new building.
What are the latest permits for 500 E 4th St?
Two permits filed December 16, 2024, cover upgrades to the fire pump and control panel: Building Permit 2024-152908 BP and Electrical Permit 2024-152908 EP.
What was demolished at 500 E 4th St?
Building Permit 2012-125779 BP, filed November 29, 2023, describes interior non-structural demolition. The record does not specify which interior areas were involved.
Was the roof replaced at 500 E 4th St?
A City of Austin building permit filed March 27, 2024, describes a re-roof. The permit record lists it as expired.
What business is going into 500 E 4th St?
The listed permits do not identify a business or tenant.
What is happening near ACC Austin Office on East 4th Street?
At 500 E 4th St, about 97 meters from ACC Austin Office, City permits list interior demolition, a re-roof, and fire-pump upgrades.
Also being built nearby
All of 78701- 401 Neches StMar 2, 2007Convention center headquarters hilton hotel · 12 m away
- 402 Neches StFeb 8, 20242024/03/08-#sxsw24official will host its lounge open to official speakers filmmakers and musicians at brush square park. tent erected on an existing platform · 40 m away
- 411 E 5th StApr 26, 2024Emergency replacement of damaged a.e. meter socket conduit damage and service conductors at susanne dickinson museum 411 e 5th street · 80 m away
- 509 E 5th StDec 9, 2025Replacement of any self-contained packaged units hilton austin / the 555 · 83 m away
- 555 E 5th StMay 19, 2026Replacement of complete existing central heat and air system with or without duct work chilled water air handler with electric heat · 85 m away
- 409 E 5th StNov 24, 2025Installation of a permanent art in public places (aipp) public art sculpture in brush square park by artist george sabra. minimal ground disturbance no utility tie ins · 87 m away
- 602 E 4th St · Acc Austin OfficeApr 10, 2025Project control acc austin office renovation — renovation/alteration — renovation of existing retail space to transition to office. include open office, large conference room, small conference room, and two phone rooms; existing restrooms, break room, and storage room to remain · 97 m away
- 501 Neches StOct 11, 2024Change of use to cocktail lounge and food sales (dispensary) for paint move in furniture and appliances · 104 m away
- 506 E 5th StMar 4, 20252025/03/07 thru 2025/03/09 -(#sxsw) sxsw guests and ga attendees will be welcomed to join the activation experience to learn more about the new loreal airlight pro tool through self discovery and through brand guidance. fun photomoments for guests ugc (user generated content) will be filtered throughout with educational moments of the product. an opportunity to meet brand pro stylists for a quick product demolition will also be available. we will be activating at sxsw as a popup experience. this activation entails product r&d touchpoints product demonstrations with brand representatives and fun ugc photomoments for all guests attending · 127 m away
- 601 E 5th StOct 9, 2024Add ups (uninterruptible power source) for existing mdf room loads along with mini-split a/c units for cooling in garage building · 128 m away
- 401 E 5th StJun 3, 2026Replace an existing natural gas option generator automatic transfer switch docking station onto the on existing equipment pad. change out service disconnect fuse. site plan exemption not required less than 100 sq ft for existing ems/fire station-this pr is a separate scope of work from active bp · 135 m away
- 606 E 3rd StApr 18, 2024Cap off with ww · 162 m away
More demolitions in 78701.