1007 E 7th St
Austin, TX 78702
Permit changes 1007 E 7th St from office to restaurant
A City of Austin permit indicates a change of use from office to restaurant general at 1007 E 7th St. Permit 2026-021640 BP was filed on February 23, 2026; the record does not specify a restaurant tenant or construction scope.
Summarized from City of Austin records · updated Feb 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 23, 2026
- since Feb 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectChange of use from office to restaurant general
Change of use from office to restaurant general
City of Austin permitBuilding PermitFinal- Record
- 2026-021640 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1007 E 7th St
What is being built at 1007 E 7th St?
A City of Austin permit indicates the existing space is changing from office use to restaurant general use. The record does not identify an operator or describe construction work.
Is a restaurant opening at 1007 E 7th St in Austin?
The permit records a change of use from office to restaurant general, but it does not name a restaurant or confirm an opening date.
When was the 1007 E 7th St restaurant permit filed?
Permit 2026-021640 BP was filed on February 23, 2026, according to the City of Austin record.
What is permit 2026-021640 BP for?
The permit is for a change of use from office to restaurant general at 1007 E 7th St. The City of Austin lists its status as Final.
Is the restaurant project near Alto Spec 400 & Corridor?
Yes. The address is about 125 meters from Alto Spec 400 & Corridor at 924 E. 7th Street, based on the nearby-landmarks record.
Does the permit give a construction cost or project size?
No. The available record does not list a reported valuation or square footage.
Also being built nearby
All of 78702- 1008 E 6th StSep 22, 2025Open up coffee and juice shop in existing building installing sinks to existing plumbing · 52 m away
- 700 San Marcos StDec 8, 2008Bonneville townhomes · 53 m away
- 1010 E 6th StOct 15, 2026Change of use from office/warehouse to personal improvement services; no remodel no construction planned · 58 m away
- 1016 E 6th StFeb 12, 2025Sxsw music event using 16x12x1 biljax stage with 9-12 occupants · 67 m away
- 708 San Marcos StMay 30, 2023San marcos hotel · 79 m away
- 603 Medina StNov 9, 2026603 medina plat · 88 m away
- 1007 E 6th StJun 10, 2024Adding ventless hoods in existing restaurant. mechanical scope of work only · 107 m away
- 1017 E 6th StJul 16, 2026Removing a type 2 vent hood and installing a type 1 vent hood · 111 m away
- 924 E 7th StNov 13, 2026Interior remodel of existing office tenant to expand suite 350 into adjacent suite. minor electrical scope shown as arch sheets and signed by master electrician. mechanical review requested just for oversight. no plumbing scope · 125 m away
- 924 East 7th Street · 7th And Sm LPSep 17, 2024Alto spec suite 300 — renovation/alteration — this project consists of the demolition and finish out of a newly demised spec suite. suite occupancy classification and use group remains unchanged by the scope of this work · 125 m away
- 924 E. 7th Street · 7th And Sm LPFeb 25, 2026Alto spec 400 & corridor — renovation/alteration — this project consists of the finish out of a newly demised tenant suite and multi-tenant corridor in an existing shell floor. suite occupancy classification and use group remains unchanged by the scope of this work · 125 m away
- 924 East 7th Street Level 3 · 7th And Sm LPSep 17, 2024Alto level 3 corridor — renovation/alteration — this project consists of the finish out of an newly demised common corridor in a shell building. suite occupancy classification and use group remains unchanged by the scope of this work · 125 m away