924 East 7th Street Level 3
Austin, TX 78702 · 7th And Sm LP
Level 3 corridor finish-out at 924 East 7th Street
A 1,145-square-foot finish-out of a newly demised common corridor is registered for Level 3 at 924 East 7th Street. The TDLR project registration was filed September 17, 2024, and lists an estimated project cost of $130,000. The registration says the building’s occupancy classification and use group remain unchanged.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2024
- since Sep 17, 2024
- Largest scope
- 1,145 sf
- Estimated cost
- $130K
- state registration
Where this project stands
CompletedALTO LEVEL 3 CORRIDOR
1,145 sq ft · $130K est.
- RegisteredSep 17, 2024
- Plan review
- ConstructionOct '24 – Jan '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project consists of the finish out of an newly demised common corridor in a shell building. suite occupancy classification and use group remains unchanged by the scope of this work. — alto
TDLR project registrationRenovation/AlterationProject Closed1,145 sq ft$130K est.- Project #
- TABS2025001128
- Tenant / owner
- Alto Level 3 Corridor
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 924 East 7th Street Level 3
What is being built at 924 East 7th Street?
The project is a finish-out of a newly demised common corridor on Level 3 of a shell building. The TDLR registration lists 1,145 square feet.
When was the 924 East 7th Street corridor project filed?
The TDLR project registration was filed September 17, 2024. It is listed as Project Closed.
How much will the corridor project at 924 East 7th Street cost?
The applicant’s estimated cost for the project is $130,000, according to the TDLR registration.
Is the project changing the building’s use?
The registration says the suite occupancy classification and use group remain unchanged by the work.
What is being renovated near Infinity Views on East 8th Street?
At 924 East 7th Street, the TDLR registration describes a 1,145-square-foot Level 3 common corridor finish-out. The filing date is September 17, 2024.
Also being built nearby
All of 78702- 924 E. 7th Street · 7th And Sm LPFeb 25, 2026Alto spec 400 & corridor — renovation/alteration — this project consists of the finish out of a newly demised tenant suite and multi-tenant corridor in an existing shell floor. suite occupancy classification and use group remains unchanged by the scope of this work
- 924 East 7th Street · 7th And Sm LPSep 17, 2024Alto spec suite 300 — renovation/alteration — this project consists of the demolition and finish out of a newly demised spec suite. suite occupancy classification and use group remains unchanged by the scope of this work
- 900 E 7th StAug 28, 2026Relocate overhead and meter can to corner of building · 39 m away
- 619 IH 35 SvrdMar 2, 2007Exxon · 88 m away
- 708 San Marcos StMay 30, 2023San marcos hotel · 102 m away
- 700 San Marcos StDec 8, 2008Bonneville townhomes · 106 m away
- 801 Embassy DrSep 9, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 106 m away
- 809 E 8th St · Infinity ViewsJun 26, 2026Application 1. first generation interior tenant office space. includes typical private offices open office workstations conference rooms. breakroom is not getting built out. this is the only permit for suite 300 · 108 m away
- 900 E 6th St · Building 2Jul 2, 2025Legacy padel — renovation/alteration — the project scope includes the partial demolition of an existing concrete tilt up panel warehouse building and interior renovation for an indoor sports facility. new outdoor courts for assembly recreational use are proposed · 113 m away
- 1007 E 7th StFeb 23, 2026Change of use from office to restaurant general · 125 m away
- 901 E. 6th Street, 4th · Clpf 901 East 6th LPJul 20, 2026Realtor.com — renovation/alteration — minor interior renovation / remodel · 125 m away
- 800 Embassy DrNov 6, 2026Replacement of an existing water heater · 133 m away