1007 E Riverside Dr
Austin, TX 78704
HVAC system replacement permitted at 1007 E Riverside Dr
A permit filed October 30, 2026, covers replacement of the existing central heating and air system at 1007 E Riverside Dr. The permit describes a 3-ton Lennox Elite non-communicating horizontal heat system, with or without ductwork changes.
Summarized from City of Austin records · updated Oct 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 30, 2026
- since Oct 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton elite non-communicating (horizontal) heat
Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton elite non-communicating (horizontal) heat
City of Austin permitMechanical PermitActive- Record
- 2026-140859 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1007 E Riverside Dr
What is being built at 1007 E Riverside Dr?
The permit is for replacing the existing central heating and air system, not for a new building. It describes a 3-ton Lennox Elite system.
Was a new HVAC system permitted at 1007 E Riverside Dr?
Yes. Austin permit 2026-140859 MP, filed October 30, 2026, covers replacement of the existing central heat and air system.
When was the HVAC replacement permit filed?
The City of Austin record shows a filing date of October 30, 2026, for permit 2026-140859 MP.
Does the work at 1007 E Riverside Dr include ductwork?
The permit description says the replacement may include ductwork changes, but does not specify whether changes will be made.
Is a new home being built at 1007 E Riverside Dr?
The available permit covers replacement of an existing heating and air system. It does not describe new home construction.
Also being built nearby
All of 78704- 1009 E Riverside DrJul 13, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out only · 5 m away
- 1001 Riverside DrNov 16, 20101001 e. riverside · 22 m away
- 1017 E Riverside DrFeb 16, 2026Replacement of an existing water heater replace tankless gas water heater · 26 m away
- 1023 E Riverside DrJun 30, 2026Demolition of existing roof and walls - install new beam above garage doorway. proposed building of a 2 tier deck above garage. minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. please note: proposed deck is to be built over existing house footprint. no change to impervious · 42 m away
- 1106 Travis Heights BlvdJun 9, 2026Addition of an uncovered wood/stone deck with stair to side of accessory structure · 78 m away
- 1011-1/2 Edgecliff TerOct 25, 2024The norwood house project: parking (with r sp-2018-0254d) · 89 m away
- 909 E Riverside DrSep 21, 2026Per tx gas- we need to relocate gas meter away from open doorways windows ac unit and electrical. life safety is a concern. we will be relocating the new gas meter15 away into a clear open area · 95 m away
- 907 E Riverside DrJan 22, 2026Addition and new construction addition of an enclosed stair tower as well as porches and decks to the main house and the construction of a new accessory dwelling unit ***new pool not in scope of work of this project · 97 m away
- 1110 Travis Heights BlvdSep 2, 2026Installation of automatic irrigation system at 1110 travis heights blvd. austii texas 78704 · 97 m away
- 903 Edgecliff TerJan 16, 2026Express: non structure exploration by removing pieces of sheetrock and exterior siding for evaluation replacing broke glass window like for like electrician to check wire safety and breaker box no fixtures to be added · 98 m away
- 1008 Harwood PlJun 1, 2026Updated: meter pull to cut power requiring only the temporary pull of the meter itself. there will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. we only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. remove meter to cut power to the house. replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. reinstall meter to re-establish power to the house · 102 m away
- 1201 Alta Vista AveDec 30, 2025Excavate 20 tunnel to repair drain line under house serving bathroom pier & beam repair drain line under house · 111 m away