groundranger
Recent · latest filing Jun 2026Residential

1008 Harwood Pl

Austin, TX 78704

Electrical panel and transfer switch work at 1008 Harwood Pl

An electrical permit filed June 1, 2026, covers replacing the home’s main panel and installing an automatic transfer switch for a subsequent battery backup system. The City of Austin permit, 2026-063987 EP, is marked final; it describes temporarily removing and reinstalling the meter to cut and restore power.

Summarized from City of Austin records · updated Jun 1, 2026

Projects
3
3 filings
Latest filing
Jun 1, 2026
since Mar 31, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Updated: meter pull to cut power requiring only the temporary pull of the meter itself. there will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. we only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. remove meter to cut power to the house. replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. reinstall meter to re-establish power to the house

  1. AppliedMay 20, 2026
  2. IssuedJun 1, 2026
  3. WorkJun '26 – Aug '26
  4. Final inspectionAug 19, 2026

Passed final inspection Aug 19, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Updated: meter pull to cut power requiring only the temporary pull of the meter itself. there will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. we only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. remove meter to cut power to the house. replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. reinstall meter to re-establish power to the house

    Updated: meter pull to cut power requiring only the temporary pull of the meter itself. there will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. we only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. remove meter to cut power to the house. replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. reinstall meter to re-establish power to the house

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of overhead service like for like with surge

    Replacement of overhead service like for like with surge

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Construct new driveway approach of 12 ft. *rs

    Construct new driveway approach of 12 ft. *rs

    City of Austin permitDriveway / SidewalksFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1008 Harwood Pl

What work is being done at 1008 Harwood Pl?

A City of Austin electrical permit covers a main panel replacement and installation of an automatic transfer switch for a subsequent battery backup system. The permit does not say that the battery system itself is being installed under this work.

When was the electrical work permitted at 1008 Harwood Pl?

The permit was filed June 1, 2026. Permit number 2026-063987 EP is marked final.

Is a new home being built at 1008 Harwood Pl?

The records provided describe electrical work at a home, not construction of a new home.

Is a battery backup system being installed at 1008 Harwood Pl?

The June 2026 permit describes installing an automatic transfer switch for a subsequent battery backup system. It does not describe installation of the battery system itself.

What does permit 2026-063987 EP cover?

The permit covers temporarily removing the meter to cut power, replacing the home’s main panel, installing an automatic transfer switch, and reinstalling the meter to restore power. It was filed June 1, 2026, and is marked final.

Was other electrical work permitted at 1008 Harwood Pl?

A separate permit filed March 31, 2025, covered a like-for-like replacement of the overhead electrical service with surge protection. Permit 2025-036628 EP is marked expired.

Also being built nearby

All of 78704
Email me when a new permit is filed