groundranger
Recent · latest filing Jul 2026Residential

304 E 35th St

Austin, TX 78705

304 E 35th St: 1 project on record

City of Austin lists 1 filing across 1 project at 304 E 35th St, Austin, TX 78705. The most recent, filed July 3, 2026, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical heat pump system”.

Compiled from City of Austin records · updated Jul 3, 2026

Projects
1
1 filings
Latest filing
Jul 3, 2026
since Jul 3, 2026
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical heat pump system

    Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical heat pump system

    City of Austin permitMechanical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 304 E 35th St

What is being built at 304 E 35th St?

The latest filing (City of Austin permit 2026-084233 MP, July 3, 2026) covers replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical heat pump system.

How many permits and filings does 304 E 35th St have?

1 filing across 1 project, from July 3, 2026 to July 3, 2026.

Is there other construction near 304 E 35th St?

Yes. Nearby filings include 306 E 35th St (porch conversion: converting existing rear screened porch into 1st floor conditioned space, Jun 20, 2024); 302 E 35th St (express: 16 existing windows - size for size, Jun 3, 2026); 3701 Grooms St (extended electrical conduit and conductors to relocate a light fixture. work description: utilize existing light circuit with wall switch. extend circuit ~8 feet so chandelier can be centered in the building. install 12 awg thhn copper conductors (hot neutral ground). run conductors in 3/4 metal conduit with metallic fittings for fire protection. provide and install listed ceiling box/support rated for 50 lbs (fixture is ~10 lbs). mount chandelier per manufacturers instructions. bond all metal components to equipment grounding conductor. test for continuity grounding and correct polarity. update panel schedule to reflect new fixture location, Oct 13, 2025).

How do I get alerts for new permits at 304 E 35th St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78705
Get alerts for 304 E 35th St