Permit for six push piers at 4901 Alf Ave
A City of Austin permit records installation of six push piers at 4901 Alf Ave. The permit, 2026-108607 BP, was filed on August 19, 2026, and is listed as final.
Summarized from City of Austin records · updated Aug 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 19, 2026
- since Aug 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress- installing 6 push piers
Express- installing 6 push piers
City of Austin permitBuilding PermitFinal- Record
- 2026-108607 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4901 Alf Ave
What is being done at 4901 Alf Ave in Austin?
A City of Austin building permit records installation of six push piers at the address. Permit 2026-108607 BP was filed August 19, 2026.
When was the permit for 4901 Alf Ave filed?
The permit was filed on August 19, 2026. Its status is listed as final.
What is permit 2026-108607 BP for?
The permit describes installing six push piers at 4901 Alf Ave, Austin, TX 78721.
Is a new building being built at 4901 Alf Ave?
The available permit record describes installation of six push piers; it does not specify construction of a new building.
What is being permitted near Springdale General Bldg. 3 Core & Suite C Demise?
At 4901 Alf Ave, about 281 meters away, an Austin permit records installation of six push piers. It was filed August 19, 2026.
How much will the work at 4901 Alf Ave cost?
The permit record does not list a reported valuation or project cost.
Also being built nearby
All of 78721- 4909 Alf AveOct 23, 2026Base: installing a backup battery system and additional meter socket · 77 m away
- 1112 Saucedo StJul 18, 2025Express - upgrade electrical service. repair drywall · 84 m away
- 1104 Saucedo StMar 20, 2024Express install metal roof · 131 m away
- 1133 Don Ann StMar 27, 2024Express replace 2 windows · 138 m away
- 4711 Munson StMar 15, 2024Replace 25 feet of sewer pipe will need to do a tunnel 18 feet. replacing the pvc line. no drain line repair per plumbing contractor · 139 m away
- 1123 Saucedo StDec 22, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out · 140 m away
- 1102 Saucedo StJul 24, 2026Install level 2 ev charger · 146 m away
- 1130 Saucedo StSep 16, 2025Upgrade from 150 amps to 200 amps with approved meter socket · 166 m away
- 1100 Saucedo StOct 27, 2026Replacement of complete existing central heat and air system with or without duct work · 173 m away
- 1132 Saucedo StMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 181 m away
- 1139 Don Ann StMar 20, 2024New in-ground pool · 183 m away
- 4703 Alf AveMay 31, 202410 tunnel below the foundation to repair break on kitchen branch drain line one access hole · 201 m away