groundranger
Active · latest filing Oct 2026Residential

4909 Alf Ave

Austin, TX 78721

Backup battery system permitted at 4909 Alf Ave

An active City of Austin electrical permit filed Oct. 23, 2026, indicates installation of a backup battery system and an additional meter socket at 4909 Alf Ave. An earlier electrical permit for a Level 2 EV charger was finalized on Feb. 15, 2024.

Summarized from City of Austin records · updated Oct 23, 2026

Projects
2
2 filings
Latest filing
Oct 23, 2026
since Feb 15, 2024
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install level 2 ev charger per austin energys plug-in rebate guidelines

    Install level 2 ev charger per austin energys plug-in rebate guidelines

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4909 Alf Ave

What is being installed at 4909 Alf Ave?

An active electrical permit indicates installation of a backup battery system and an additional meter socket. The permit is 2026-131452 EP, filed Oct. 23, 2026.

When was the backup battery permit filed at 4909 Alf Ave?

The City of Austin filed permit 2026-131452 EP on Oct. 23, 2026.

Is the permit for the battery system active?

Yes. City of Austin records list electrical permit 2026-131452 EP as active.

What is permit 2026-131452 EP for?

The permit description says it covers installing a backup battery system and an additional meter socket at 4909 Alf Ave.

Does 4909 Alf Ave have an EV charger permit?

Yes. A separate City of Austin electrical permit for a Level 2 EV charger was filed Feb. 15, 2024, and is listed as final.

What permits have been filed at 4909 Alf Ave?

Records show two City of Austin electrical permits: a Level 2 EV charger permit filed Feb. 15, 2024, and an active permit for a backup battery system and additional meter socket filed Oct. 23, 2026.