4909 Alf Ave
Austin, TX 78721
Backup battery system permitted at 4909 Alf Ave
An active City of Austin electrical permit filed Oct. 23, 2026, indicates installation of a backup battery system and an additional meter socket at 4909 Alf Ave. An earlier electrical permit for a Level 2 EV charger was finalized on Feb. 15, 2024.
Summarized from City of Austin records · updated Oct 23, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 23, 2026
- since Feb 15, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-131452 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install level 2 ev charger per austin energys plug-in rebate guidelines
Install level 2 ev charger per austin energys plug-in rebate guidelines
City of Austin permitElectrical PermitFinal- Record
- 2024-017392 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4909 Alf Ave
What is being installed at 4909 Alf Ave?
An active electrical permit indicates installation of a backup battery system and an additional meter socket. The permit is 2026-131452 EP, filed Oct. 23, 2026.
When was the backup battery permit filed at 4909 Alf Ave?
The City of Austin filed permit 2026-131452 EP on Oct. 23, 2026.
Is the permit for the battery system active?
Yes. City of Austin records list electrical permit 2026-131452 EP as active.
What is permit 2026-131452 EP for?
The permit description says it covers installing a backup battery system and an additional meter socket at 4909 Alf Ave.
Does 4909 Alf Ave have an EV charger permit?
Yes. A separate City of Austin electrical permit for a Level 2 EV charger was filed Feb. 15, 2024, and is listed as final.
What permits have been filed at 4909 Alf Ave?
Records show two City of Austin electrical permits: a Level 2 EV charger permit filed Feb. 15, 2024, and an active permit for a backup battery system and additional meter socket filed Oct. 23, 2026.
Also being built nearby
All of 78721- 1112 Saucedo StJul 18, 2025Express - upgrade electrical service. repair drywall · 37 m away
- 4901 Alf AveAug 19, 2026Express- installing 6 push piers · 77 m away
- 1123 Saucedo StDec 22, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out · 78 m away
- 1104 Saucedo StMar 20, 2024Express install metal roof · 112 m away
- 1142 Brookswood AveNov 2, 2026New pocket door and reconfiguration of primary bathroom · 128 m away
- 1102 Saucedo StJul 24, 2026Install level 2 ev charger · 130 m away
- 1144 Brookswood AveAug 1, 2024Replacement of an existing water heater · 135 m away
- 1130 Saucedo StSep 16, 2025Upgrade from 150 amps to 200 amps with approved meter socket · 139 m away
- 1146 Brookswood AveApr 22, 2024Replace old shower for new an install shower valve · 143 m away
- 1143 Brookswood AveJun 8, 2026Applying for electrical permit per plumbing 2026-033370 pp: addition of electrical circuit to be permitted and inspected · 149 m away
- 1133 Don Ann StMar 27, 2024Express replace 2 windows · 150 m away
- 1126 Brookswood AveSep 3, 2025Running conduit to the pergola and hardwire 2 fans 4lights under the pergola with a switch for both and add 2 outlets pergola is 18 x 8 total 144sqft · 150 m away