6219-1/2 Levander Loop
Austin, TX 78721
Austin approved a site plan for Capital Aggregates Inc.
A City of Austin site-plan case for Capital Aggregates Inc. was approved and released on December 5, 2025, at 6219-1/2 Levander Loop. The record does not specify what will be built or provide a project size.
Summarized from City of Austin records · updated Dec 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 5, 2025
- since Dec 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 6219-1/2 Levander Loop
What is being built at 6219-1/2 Levander Loop?
A City of Austin site-plan case for Capital Aggregates Inc. was approved and released on December 5, 2025. The record does not describe the proposed construction.
Who is associated with the project at 6219-1/2 Levander Loop?
The City of Austin case names Capital Aggregates Inc. The record does not identify an occupant or tenant.
Has the site plan for 6219-1/2 Levander Loop been approved?
Yes. City of Austin case 13279151 is listed as approved and released on December 5, 2025.
How large is the project at 6219-1/2 Levander Loop?
The City of Austin record does not list a square footage or project size.
How much will the project at 6219-1/2 Levander Loop cost?
The record does not provide a project cost or reported valuation.
Also being built nearby
All of 78721- 7201 Levander LoopNov 9, 2026Abandon old gas line in place. install new gas line like for like · 412 m away
- 827 Ed Bluestein BlvdNov 7, 2026Bolm riverfront district west - block 1 · 453 m away
- 90 Montopolis DrSep 9, 202590 montopolis drive · 464 m away
- 118 Hergotz LnJun 4, 2024Replacement of complete existing central heat and air system with or without duct work · 484 m away
- 119 Hergotz LnNov 27, 2024Express: replace roof shingles more than 128 sq ft of decking will be replaced · 487 m away
- 121 Hergotz LnSep 11, 2025Tpole for all contractors to have power during the remodel. ***ref: 2022-144394 bp · 502 m away
- 71 Strandtman CvNov 13, 2026Project elsie (with r sp-2024-0294d) · 509 m away
- 5901 Jorge Guerra StDec 31, 2025New construction two-unit residential 3-story duplex: 3 bedroom 3 bath covered front porch and covered rear porch · 520 m away
- 5903 Jorge Guerra StDec 31, 2025New construction two-unit residential 3-story duplex: 3 bedroom 3 bath covered front porch and covered rear porch · 522 m away
- 5905 Jorge Guerra StDec 31, 2025Building 5905 jorge guerra st new construction of a 3-story duplex as part of a larger development of 15 total buildings on a single lot. 3/3 · 524 m away
- 5907 Jorge Guerra StJan 2, 2026Building 5907 jorge guerra st new construction of a 3-story duplex as part of a larger development of 15 total buildings on a single lot. 3/3 · 526 m away
- 800 Interchange BlvdSep 25, 2024Fix existing disconnect 1 is 100 amp 1 is 200 amp permit is for 102 a and 102 b these are existing meter cans and no change to the electric service equipment is proposed - jeffery diaz 9/30/24 · 529 m away