827 Ed Bluestein Blvd
Austin, TX 78721 · Daniel Zunker
Bolm Riverfront District West planning cases recorded
City of Austin records show a subdivision case for Bolm Riverfront District West filed on September 22, 2025, and a site-plan case for Block 1 filed on November 7, 2026. The subdivision case is marked expired, and the Block 1 site-plan case is marked inactive; the records do not describe specific buildings or uses.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 827 Ed Bluestein Blvd
What is being built at 827 Ed Bluestein Blvd?
Austin records list planning cases for Bolm Riverfront District West, including a subdivision case and a site-plan case for Block 1. They do not specify what buildings or uses are proposed.
What is the Bolm Riverfront District West project?
It is the name attached to a City of Austin subdivision case filed September 22, 2025. A related site-plan case for Block 1 was filed November 7, 2026.
Is the Bolm Riverfront District West project approved?
The subdivision case is marked expired, and the Block 1 site-plan case is marked inactive in the records provided. These records do not show an active case.
When were plans filed for 827 Ed Bluestein Blvd?
The subdivision case was filed September 22, 2025. The Block 1 site-plan case was filed November 7, 2026.
What does the Block 1 site-plan case cover?
The City of Austin record names it “Bolm Riverfront District West - Block 1” and classifies it as a site plan. It does not include a project size or describe the proposed development.
Also being built nearby
All of 78721- 915 Ed Bluestein Road · Bolm Owner LLCJul 2, 2025East bolm — new construction — new construction of 4 multi-family buildings, building 1 - 104,927 sq ft; building 2 - 130,342 sq ft; building 3 - 110,457 sq ft; building 4 - 108,721 sq ft total sq ft of project 454,447 sq ft · 152 m away
- 800 Interchange BlvdSep 25, 2024Fix existing disconnect 1 is 100 amp 1 is 200 amp permit is for 102 a and 102 b these are existing meter cans and no change to the electric service equipment is proposed - jeffery diaz 9/30/24 · 239 m away
- 825 Interchange BlvdFeb 14, 2013Whole foods truck parking facility · 300 m away
- 5907 Jorge Guerra StJan 2, 2026Building 5907 jorge guerra st new construction of a 3-story duplex as part of a larger development of 15 total buildings on a single lot. 3/3 · 329 m away
- 5905 Jorge Guerra StDec 31, 2025Building 5905 jorge guerra st new construction of a 3-story duplex as part of a larger development of 15 total buildings on a single lot. 3/3 · 336 m away
- 5903 Jorge Guerra StDec 31, 2025New construction two-unit residential 3-story duplex: 3 bedroom 3 bath covered front porch and covered rear porch · 342 m away
- 800 Linger LnOct 23, 2025Excavating the middle of existing commercial property and digging a pit and resurfacing it with concrete for an auger system to go inside · 343 m away
- 5901 Jorge Guerra StDec 31, 2025New construction two-unit residential 3-story duplex: 3 bedroom 3 bath covered front porch and covered rear porch · 348 m away
- 840 Interchange Blvd · Bre Jupiter B Icon TX Owner, LP % Blackstone Real Estate Advisors L PJul 31, 2026Installation of a conveyor system inside of an existing customer warehouse - no mechanical electrical or plumbing work being conducted within this scope of work · 350 m away
- 801 Johnny Limon WayDec 29, 2025New construction of 3 story duplex condo (3 beds 3 baths covered patio) (801 johnny limon way) · 366 m away
- 800 Gardner RdFeb 9, 2026***per coordination with 2025-161971 ex this project will clear the row by 02/12/26. conflict check required for extension*** construct new sidewalk of 426 lf 2025 096399 000 00 ssi sp-2022-0505c.sh · 367 m away
- 726 Linger LnJul 29, 2024Discconect mcc from ae service and safe off conduits. (tenant move out) · 368 m away