City of Austin lists 2 filings across 2 projects at 2101 Maple Ave, Austin, TX 78722 since August 21, 2025. The most recent, filed December 15, 2025, covers: “Express: siding replacement”.
Compiled from City of Austin records · updated Dec 15, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 15, 2025
- since Aug 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsExpress: siding replacement
Express: siding replacement
City of Austin permitBuilding PermitWithdrawn- Record
- 2025-116161 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of mini-split system
Replacement of mini-split system
City of Austin permitMechanical PermitFinal- Record
- 2025-101647 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2101 Maple Ave
What is being built at 2101 Maple Ave?
The latest filing (City of Austin permit 2025-116161 BP, December 15, 2025) covers express: siding replacement.
How many permits and filings does 2101 Maple Ave have?
2 filings across 2 projects, from August 21, 2025 to December 15, 2025.
Is there other construction near 2101 Maple Ave?
Yes. Nearby filings include 2102 Maple Ave ((strain-seymour ian) - installation of circuit for elec. vehicle charging station - esip, Aug 13, 2025); 2106 Maldon Pl (excavate and replace the sewer line from the house to the city sewer tap or the city right of way whichever is applicable. this also includes taking out the cast-iron stack and cast-iron underneath the house and tying into the existing pvc and running a new rerouted mainline to the exterior of the home on the right side of the house, Apr 22, 2026); 2107 Maple Ave (installation of residential ev charger, Jun 18, 2025).
How do I get alerts for new permits at 2101 Maple Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78722- 2102 Maple AveAug 13, 2025(strain-seymour ian) - installation of circuit for elec. vehicle charging station - esip · 40 m away
- 2106 Maldon PlApr 22, 2026Excavate and replace the sewer line from the house to the city sewer tap or the city right of way whichever is applicable. this also includes taking out the cast-iron stack and cast-iron underneath the house and tying into the existing pvc and running a new rerouted mainline to the exterior of the home on the right side of the house · 50 m away
- 2107 Maple AveJun 18, 2025Installation of residential ev charger · 54 m away
- 2305 E 21st StJul 24, 2025Relocate existing meter and add an additional meter to a service rack ---address incorrect. changed 07/31/2025 to reflect primary structure address--slc · 63 m away
- 2109 Maple AveJul 22, 2025Irrigation installation · 70 m away
- 2502 Weber AveJan 24, 2024Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 2405 E 22nd StJul 21, 2025Irrigation install · 75 m away
- 2403 E 22nd StJul 22, 2025Irrigation install · 75 m away
- 2007 Maple AveJun 29, 2026Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 2110 Maldon PlOct 14, 2026Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 81 m away
- 2409 E 22nd StOct 14, 2026Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 83 m away
- 2006 Maple AveNov 9, 2026Partial demolition of the non-historic portion of the existing sfr; remodel of the historic sfr including the kitchen and bathroom; and rear addition with a carport covered patio and new bedroom suite with bathroom · 86 m away