2102 Maple Ave
Austin, TX 78722
2102 Maple Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 2102 Maple Ave, Austin, TX 78722. The most recent, filed August 13, 2025, covers: “(strain-seymour ian) - installation of circuit for elec. vehicle charging station - esip”.
Compiled from City of Austin records · updated Aug 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 13, 2025
- since Aug 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project(strain-seymour ian) - installation of circuit for elec. vehicle charging station - esip
(strain-seymour ian) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2025-096878 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2102 Maple Ave
What is being built at 2102 Maple Ave?
The latest filing (City of Austin permit 2025-096878 EP, August 13, 2025) covers (strain-seymour ian) - installation of circuit for elec. vehicle charging station - esip.
How many permits and filings does 2102 Maple Ave have?
1 filing across 1 project, from August 13, 2025 to August 13, 2025.
Is there other construction near 2102 Maple Ave?
Yes. Nearby filings include 2101 Maple Ave (express: siding replacement, Dec 15, 2025); 2305 E 21st St (relocate existing meter and add an additional meter to a service rack ---address incorrect. changed 07/31/2025 to reflect primary structure address--slc, Jul 24, 2025); 2107 Maple Ave (installation of residential ev charger, Jun 18, 2025).
How do I get alerts for new permits at 2102 Maple Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78722- 2101 Maple AveDec 15, 2025Express: siding replacement · 40 m away
- 2305 E 21st StJul 24, 2025Relocate existing meter and add an additional meter to a service rack ---address incorrect. changed 07/31/2025 to reflect primary structure address--slc · 51 m away
- 2107 Maple AveJun 18, 2025Installation of residential ev charger · 61 m away
- 2109 Maple AveJul 22, 2025Irrigation installation · 74 m away
- 2403 E 22nd StJul 22, 2025Irrigation install · 79 m away
- 2106 Maldon PlApr 22, 2026Excavate and replace the sewer line from the house to the city sewer tap or the city right of way whichever is applicable. this also includes taking out the cast-iron stack and cast-iron underneath the house and tying into the existing pvc and running a new rerouted mainline to the exterior of the home on the right side of the house · 80 m away
- 2409 E 22nd StOct 14, 2026Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 81 m away
- 2006 Maple AveNov 9, 2026Partial demolition of the non-historic portion of the existing sfr; remodel of the historic sfr including the kitchen and bathroom; and rear addition with a carport covered patio and new bedroom suite with bathroom · 84 m away
- 2405 E 22nd StJul 21, 2025Irrigation install · 85 m away
- 2007 Maple AveJun 29, 2026Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 2110 Maldon PlOct 14, 2026Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 100 m away
- 2502 Weber AveJan 24, 2024Replacement of complete existing central heat and air system with or without duct work · 107 m away